CHURCH STREET, LISTOWEL, CO. KERRY
Planning application 22110
DecisionConditional grant
Decided01 April 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near CHURCH STREET, LISTOWEL, CO. KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 231029(A) DEMOLISH THE EXISTING PARTIALLY CONSTRUCTED BUILDING, (B) CONSTRUCT A NEW DWELLING WITH (C) ALL ASSOCIATED SITE WORKS / 0.1 km away / 24 January 2024Granted
- 221344CHANGE OF USE OF A FIRST FLOOR STOREROOM, AS GRANTED UNDER PLANNING PERMISSION 19/1001, TO RESIDENTIAL USE AND TO CARRY OUT SUCH BUILDING WORKS AS ARE NECESSARY TO CONVERT THE SAID STOREROOM TO A ONE BED APARTMENT AND ALL ASSOCIATED WORKS TO THE REAR OF NO'S 19 AND 21 WILLIAM STREET (NO 21 WILLIAM STREET BEING A PROTECTED STRUCTURE RPS REFERENCE NUMBER 37) / 0.1 km away / 05 July 2023Granted
- 2560576Retention permission to retain ground floor apartment as built and associated site works all as built / 0.1 km away / 28 August 2025Granted
- 191001TO CARRY OUT PROPOSED WORKS TO THE REAR OF NO. 21 WILLIAM STREET [A PROTECTED STRUCTURE - RPS REF. NO.37] AND TO THE REAR OF NO. 19 WILLIAM STREET [ADJOINING NO. 21]. THE PROPOSED WORKS WILL INCLUDE: (i) THE DEMOLITION OF EXISTING STRUCTURES TO THE REAR OF NO. 21 WILLIAM STREET AND NO. 19 WILLIAM STREET AND THE CONSTRUCTION OF A SINGLE STOREY EXTENSION ON THE FOOTPRINT OF SAID STRUCTURES BEING DEMOLISHED FOR THE PURPOSES OF EXTENDING THE EXISTING BETTING SHOP AT NO. 19 WILLIAM STREET (ii) THE CONSTRUCTION OF EXTENSIONS AT FIRST FLOOR LEVEL TO THE REAR OF NO'S 21 WILLIAM STREET AND 19 WILLIAM STREET (iii) THE CONSTRUCTION OF A NEW FACADE FACING THE LANE TO THE REAR OF NO'S 19 AND 21 WILLIAM STREET, (iv) THE ERECTION OF SIGNAGE ON SAID REAR FACADE AND ALL ASSOCIATED WORKS / 0.1 km away / 09 June 2020Granted
- 18653RETAIN DEVELOPMENT WHICH CONSISTS OF AN EXTERNAL PLANT AREA WITH CONDENSERS HOUSED IN A FLOWFORGE CAGE 8.3M X 5M X 2.7M HIGH SET ON A CONCRETE PLINTH IN THE EXISTING CAR PARK AT THE SOUTH EAST CORNER OF THE BUILDING AND PERMISSION TO CREATE 3 NUMBER ADDITIONAL CAR PARKING SPACES ON SITE AND PERMISSION TO IMPLEMENT ROAD SAFETY REQUIREMENTS / 0.1 km away / 27 March 2019Granted
- 17833FOR DEVELOPMENT WHICH WILL CONSIST OF COMBINING THE SHOP UNIT, AT THE NORTH WEST CORNER AND THE RETAIL UNIT ACROSS THE SOUTH END OF IT'S BUILDING, BOTH AT GROUND FLOOR LEVEL, IN TO A SINGLE RETAIL UNIT, ASSOCIATED INTERNAL LAYOUT CHANGES AND ASSOCIATED CHANGES TO THE ELEVATIONS TO INCLUDE NEW SIGNAGE TO THE COMBINED UNIT / 0.1 km away / 18 October 2017Granted
- 221193RETAIN HIS APARTMENT / 0.1 km away / 19 January 2023Granted
- 22311MAKE MINOR INTERNAL AND EXTERNAL ALTERATIONS ALONG WITH THE REPLACEMENT OF THE EXISTING SECOND FLOOR FLAT ROOF WITH A PITCH ROOF AND 4 ROOF LIGHTS, EXTENSION AT SECOND FLOOR TO THE REAR AND SIDE OVER THE EXISTING FLAT ROOF AREA, REWORKING OF THE LIVING QUARTERS WITH THE PROVISION OF A ROOF TOP TERRACE AT SECOND FLOOR TO THE REAR AND REMOVAL OF THE EXISTING REAR CHIMNEY, ALONG WITH ALL SERVICES AND SERVICE CONNECTIONS ASSOCIATED WITH THE ABOVE. THIS BUILDING IS A PROTECTED STRUCTURE / 0.1 km away / 15 June 2022Granted