SAND QUAY BRIDGE STREET, AGHANAGRAN MIDDLE, BALLYLONGFORD CO KERRY
Planning application 231053
DecisionConditional grant
Decided11 December 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near SAND QUAY BRIDGE STREET, AGHANAGRAN MIDDLE, BALLYLONGFORD CO KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 201291(I) A REVISED TRAFFIC AND PARKING LAYOUT ON OVERALL SITE ON BOTH SIDES OF PUBLIC ROAD INCORPORATING A PELICAN CROSSING CONNECTING SOUTHERN CAR PARK TO SUPERMARKET (ii) SINGLE STOREY STORES BUILDING AT THE REAR OF THE EXISTING CENTRAL SUPERMARKET BUILDING, (iii) THE DEMOLITION OF THE EXISTING STORES BUILDING ON THE FRONT (SOUTH EASTERN) OF THE EXISTING SUPERMARKET BUILDING AND THE CONSTRUCTION OF A NEW SINGLE STOREY EXTENSION FOR RETAIL USE AND SEATING AREA, (iv) THE CONSTRUCTION OF A NEW SINGLE STOREY STORES BUILDING AT THE REAR OF THE EXISTING CENTRA SUPERMARKET BUILDING, (v) THE INSTALLATION OF SOLAR PHOTOVOLATIC (PV) PANELS MOUNTED ON THE ROOF OF THE SUPERMARKET BUILDING AND ON THE ROOF OF THE NEW EXTENSION (vi) ALTERATIONS TO THE EXISTING FRONT ELEVATION OF THE SUPERMARKET BUILDING INCLUDING SIGNAGE AND ALL ASSOCIATED SITE WORKS / 0.2 km away / 26 November 2021Granted
- 181027(A) RETENTION PERMISSION TO RETAIN DWELLING HOUSE, GARAGE AND VEHICULAR ENTRANCE ALL WITHIN REVISED SITE BOUNDARIES AND (B) PERMISSION TO ERECT A SINGLE STOREY EXTENSION TO HIS DWELLING HOUSE AND ALSO INSTALL A WINDOW ON THE NORTHERN GABLE OF SAME DWELLING HOUSE / 0.2 km away / 23 August 2019Granted
- 21296ERECT A COFFEE SHOP WITH CONNECTIONS TO MAINS WATER AND SEWER AND CARRYING OUT ASSOCIATED SITE WORKS / 0.2 km away / 25 January 2022Granted
- 2460499I, Jim O’Keeffe, wish to apply for planning permission for proposed development on site located at existing car parking area ancillary to Centra Supermarket, Bridge Street, Ballylongford, Aghanagran Middle, Co. Kerry. Proposed works: 1) alteration to the existing carpark layout, located to the east of Bridge Street, to accommodate the construction of new 24/7 unmanned fuel filling station consisting of 1 no. dispenser pump island dispensing fuel on each side, with canopy over and associated outdoor payment terminal and signage on canopy; 2) installation of new underground storage fuel tanks, and all associated fuel pipework, off-fill points and vents; 3) construction of new ancillary elec/comms service outbuilding to serve the proposed development; 4) alterations to the existing car park layout with provision of 1 no. EV charging space; 5) concrete slab surfacing, asphalt surfacing and associated drainage with the provision of new Class A Petrol interceptor; 6) construction of new footpath and boundary wall between Bridge Street and subject site, new site vehicular entrance and modification to existing entrance, provision of pedestrian crossing on Bridge Street and all associated road safety improvement works; 7) construction of all associated site features including landscaping and boundary treatments, public lighting and all associated site works. / 0.2 km away / 24 February 2025Granted
- 23671CONSTRUCT A MULTI-USE GAMES AREA INCLUDING ASSOCIATED ANCILLARY ISTE WORKS / 0.3 km away / 06 September 2023Granted
- 20956CONSTRUCT A COMMUNITY PLAYGROUND AREA INCLUDING ASSOCIATED ANCILLARY SITE WORKS / 0.3 km away / 01 December 2020Granted
- 21122ERECT A GAZEBO TYPE STRUCTURE ON THE PLAYGROUND SITE / 0.3 km away / 07 April 2021Granted
- 2560258Change the use of the existing Butcher shop to the front and associated areas to the rear to domestic use only. To demolish the existing front 2 storey part of their building, and to set back and build a new 2 storey extension to the front of their building to be used solely as domestic accommodation and all associated site works / 0.3 km away / 25 August 2025Granted