FARRANREDMOND, DINGLE, CO KERRY
Planning application 2379
DecisionConditional grant
Decided16 November 2023
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near FARRANREDMOND, DINGLE, CO KERRY?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20151RETAIN (1) AS CONSTRUCTED DWELLING HOUSE AND GARAGE WITH PUBLIC SEWER CONNECTION AND (2) ALL BUILDINGS WITHIN REVISED SITE BOUNDARIES / 0.0 km away / 09 April 2020Granted
- 206991. CONSTRUCT FIVE NO, TWO BEDROOM DWELLING HOUSES, TWENTY TWO NO. THREE BEDROOM DWELLING HOUSES, FOUR NO. FOUR BEDROOM DWELLING HOUSES, TWO NO. TWO BEDROOM APARTMENTS AND TEN NO. ONE BEDROOM APARTMENTS TO BE COMPRISED OF ONE TWO STOREY TERRACE CONTAINING SEVEN DWELLINGS, TWENTY- FOUR TWO STOREY SEMI- DETACHED DWELLINGS AND THREE TWO STOREY APARTMENT BUILDINGS. 2. ASSOCIATED SITE DEVELOPMENT AND SERVICE WORKS INCLUDING SITE ENTRANCE WORKS, PEDESTRIAN ACCESS WORKS, SERVICE ROADWAYS, FOOTPATHS, PARKING AREAS, LIGHTING, LANDSCAPING, ANCILLARY WORKS AND CONNECTION TO PUBLIC SEWER / 0.1 km away / 03 March 2021Granted
- 20222CONSRUCT 2 NUMBER SPILT LEVEL BUILDINGS CONSISTING OF 4 NUMBER APARTMENTS IN EACH, CAR PARKING, EXTERNAL SERVICE AMENITY AREAS ALL TO SERVE THE AFOREMENTIONED, THE UNITS TO BE CONNECTED TO PUBLIC SERVICES AND ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS / 0.2 km away / 21 January 2021Granted
- 2560469Retention permission to ( a) retain an as constructed dwelling house with public sewer connection and all associated ancillary site works and (b) retain existing dwelling within revised boundaries / 0.2 km away / 16 July 2025Granted
- 23916TO (1) RETAIN 5 NO. AS CONSTRUCTED DETATCHED DWELLING HOUSES ON SITE NOS. 1, 2, 5, 6, AND 7 AND 4 NO. AS CONSTRUCTED SEMI-DETATCHED DWELLING HOUSES ON SITE NOS. 3, 4, 8 AND 9 (2) RETAIN GARDEN SHEDS TO SITE NOS. 4, 8 AND 9 (3) RETAIN AND COMPLETE EXISTING FOOTPATHS AND SERVICE ROAD SERVING THE HOUSING ESTATE AND ALL ASSOCIATED ANCILLARY SITE WORKS/SERVICES AND (4) RETAIN ALL BUILDINGS, GREEN AREAS, SERVICE ROAD, FOOTPATHS AND ALL ASSOCIATED ANCILLARY WORKS/SERVICES WITHIN REVISED SITE BOUNDARIES (B) FULL PERMISSION TO CONSTRUCT GARDEN SHEDS TO THE REAR OF DWELLING HOUSE ON SITE NOS. 1,2,3,5,6 AND 7 / 0.2 km away / 31 July 2024Granted
- 211173(A) RETAIN AS CONSTRUCED DOMESTIC GARAGE (B) RETAIN ALL BUILDINGS WITHIN REVISED BOUNDARIES AND (C) FULL PERMISSION TO CONSTRUCT AN EXTENSION TO EXISTING DWELLING HOUSE / 0.2 km away / 28 January 2022Granted
- 2560068(1) Retain installed first floor area in Distillery Production Building 183m2 consisting of: staff kitchen 12.7m2, shop with tasting bar 26.9m2; visitor area 143.4m2 (2) Visitor Centre use on site and Planning Permission for (1) Partial demolition of single storey projecting elements on south side (103 sq.m.) (2) Upgrade / replacement of external cladding (including reconfiguration of openings) (3) Internal layout modifications (4) Additional 323 sq.m. at upper level (including visitor use) (5) Change of use of 59 sq.m. of lower level production area to retail (6) Change of use of 12m2 of lower level production area to open office area (7) Change of use from permitted storage (Upper Shed) 412m2 to proposed industrial use (Distilling and ancillary storage) (8) New retail area at lower level 142m2 (9) Two new (8.8m high) freestanding steel grain storage silos to front (10) Connection of sewage system to mains (to replace septic tanks) (11) Landscaping (12) Bicycle, car and bus parking provision on site and all associated site ancillary works / 0.2 km away / 13 February 2026Granted
- 22890CHUN 400M2 (50.6WP) DE PHAINEIL GREINE A CHUR IN AIRDE AT FHRAMAI MIONTAL AR AN DTALAMH AGUS NA HOIBREACHA A BHAINEANN LEO. (CONSTRUCT 400M2 (50.6KWP) OF GROUND SOLAR PANELS ON METAL FRAMES AND ALL ASSOCIATED WORKS) / 0.2 km away / 18 October 2022Granted