Kerry Technology Park, Dromthacker, Tralee
Planning application 2460694
DecisionConditional grant
Decided24 October 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kerry County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kerry has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Kerry Technology Park, Dromthacker, Tralee?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360295See site notice for full description. Below is a brief description set to the character limit of the Planning Portal. Astellas Ireland Co., Ltd., intend to apply for permission for development of a pharmaceutical ‘Fill-Finish’ production facility over two construction phases. The application seeks a 10 year duration of planning permission. The proposed development will include: (i) a 3 storey pharmaceutical ‘Fill-Finish’ Production Building with an overall total building floor area of 19,989 sqm and maximum height to roof parapet of approximately 24.63m constructed over 2 no. phases. (ii) a Central Utilities Building (CUB) with floor area of 663 sqm and maximum height to roof parapet of approximately 10.135m to include vent outlets. (iii) A Woodchip Boiler Building constructed in Phase 1, with a floor area of 359 sqm and maximum height to roof parapet of 9.26m to include 2 no. flues. (iv) Electrical Switch Room and ESB Sub-Station Building constructed in Phase 1, with a floor area of 37 sqm and maximum height to roof parapet of approximately 2.965m; (v) a Security Office Building constructed in Phase 1, with floor area of 63 sqm and maximum height to roof parapet of approximately 4.965m; (vi) a Sprinkler Pump House constructed in Phase 1, with floor area of 40 sqm and maximum height to parapet of approximately 4.21m with associated Sprinkler Water Tank; (vii) a Waste Water Pre-Treatment Plant, with 1 no. associated storage tank constructed in Phase 1 and a second associated storage tank constructed in Phase 2; (viii) Utilities and Services Yard (ix) Site infrastructure works (x) Site boundary fencing and site landscaping; (xi) A temporary contractor’s compound and parking area for the duration of the construction works. The applicant also intends to submit a concurrent planning application to alter electrical cable infrastructure on adjoining and overlapping lands. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. / 0.1 km away / 19 December 2023Granted
- 21525CHANGE THE FRONT ELEVATION OF THE EXISTING DWELLING BY REPLACING EXISTING GARAGE DOOR WITH WINDOW / 0.2 km away / 13 July 2021Granted
- 18665RETAIN AN EXISTING SINGLE STOREY DWELLING HOUSE SERVED BY A GARAGE AND GLASS HOUSE ALL AS CONSTRUCTED / 0.2 km away / 27 August 2018Granted
- 2460288THE PROPOSED DEVELOPMENT WILL CONSIST OF (i) THE PARTIAL CHANGE OF USE OF EXISTING BUILDING AT GROUND FLOOR LEVEL FROM PRODUCTION TO OFFICE AND CANTEEN (ii) THE CONSTRUCTION OF A SUSPENDED FLOOR AT FIRST FLOOR LEVEL WITHIN HIGH BAY SECTION OF EXISTING BUILDING FOR OFFICE AND PLANTROOM USE, (iii) EXTERNAL GROUND & ROOF MOUNTED PLANT AND EQUIPMENT (iv) SIGNAGE (v) PROVISION OF PERIMETER FENCING TOGETHER WITH ALL ASSOCIATED SITE WORKS. / 0.2 km away / 13 June 2024Granted
- 17349CONSTRUCT A NEW SINGLE STOREY GENERATOR BUILDING WITH ALL ANCILLARY SITE WORKS ALL AT KERRY TECHNOLOGY PARK / 0.3 km away / 21 December 2017Granted
- 2561153Electricity Supply Board (ESB) intends to apply for permission for development of a 38 kV/MV Gas Insulated Switchgear (GIS) Electrical Substation at this site (1.31ha) at Kerry Technology Park, Dromthacker, Tralee, Co. Kerry. The site is generally bound to the north by the Kerry Technology Park access road (subject to planning permission Ref: 2360295); to the east by the rear of residential properties; to the south by the Knockawaddra Road and the rear of residential and commercial properties along the Knockawaddra Road and to the west by an existing office building and associated car parking area. The proposed development will consist of: • Construction of a substation compound of approximately 2,006m2 gross area enclosed by a 2.6m high stone wall along the northern perimeter of the substation and a 2.6 m high palisade fence around the eastern, southern and western sides of the perimeter of the substation, with the following electrical plant within the substation: • 1 No. prefabricated 38 kV GIS module and foundation (c.31.0m2 and c.5.1 m high); • 1 No. prefabricated MV GIS module and foundation (c.34.0 and c.4.6m high); • 1 No. prefabricated Control Room module and foundation (c.34.0m2 and c.4.6 m high); • 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.45.85m2, c.4.7 m high ea.); • 1 No. House Transformer (c. 7.4 m2 and c. 1.3 m high); and • All associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables. • Internal access road within the proposed substation compound. • Site access road and footpath from the existing internal technology park road and footpath. • All associated site development works above and below ground including provision of lighting, boundary fences, landscaping, site services including drainage and all other works. / 0.3 km away / 09 April 2026Granted
- 19573(A) CHANGE THE USE OF A FUEL DISTRIBUTION YARD AND COVERED STORAGE UNIT, (B) PART DEMOLISH THE EXISTING LEAN TO STRUCTURE, TO CONSTRUCT A WAREHOUSE TYPE STRUCTURE AT APPROXIMATELY 780 SQM TO ACCOMMODATE TRALEE GYMNASTICS CLUB LTD AND (C) CONSTRUCT 600 SQM OF WHOLESALE WAREHOUSING WITH ALL ASSOCIATED SITE WORKS AND ON SITE PARKING / 0.4 km away / 24 July 2019Granted
- 267REDSIII for a c.125 kWp renewable energy solar PV installation consisting of up to c.575m2 (213No.) Roof Mounted solar panels and all associated works / 0.5 km away / 24 April 2026Granted