GrantedDecided 12 February 2025Kerry County Council

Park Hotel Shelbourne Street, Kenmare, Co. Kerry

Planning application 2460962
DecisionConditional grant
Decided12 February 2025
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Kerry County Council.
The proposed development comprises of amendments, modifications, extension and part change of use of the existing two storey Spa building connected to the hotel to the west of the hotel, including: (a) At ground floor level: (i) Refurbishment of the existing spa facilities and consolidation of all spa facilities into the ground floor of the existing two storey spa building; (ii) An extension to the ground floor to the west of circa 38 sq.m gross to provide for additional space to accommodate the full extent of the spa facilities at ground floor. The proposed extension at this level occurs in the location of an existing deck area to the west end of the building. (iii) New outdoor area to be west of new extension. (iv) An extension to the south of 8 sq.m, located to the west of the existing treatment room. (v) Extension to the north of 5 sq.m to provide for a widening of an existing corridor. (vi) An extension of 26 sq.m to the existing link corridor to the main hotel, to provide a widened corridor. The overall increase in floorspace at ground floor will be circa 77 sq.m gross. (b) At first floor level: (i) Provide the hotel with 6 no. additional guestrooms at first floor level through internal reconfiguration and amendment of existing space and extension of 90 sq.m through infilling of an existing south facing balcony located centrally; (ii) An extension to the west, partly above the extension at ground floor referenced above, to provide additional indoor space of 70 sq.m gross. (iii) A new first floor corridor linking to the existing hotel, above the existing single level corridor to the east of the Spa building, comprising of an extension of 77 sq.m gross. (iv) Part of the large existing lounge at first floor level, to the north of the first floor, to be converted into a yoga space. The existing gym is to be retained with some minor modifications, and a new pilates area to be created by modifying the existing deck space. (v) Extension of 26 sq.m gross (above proposed ground floor extension) to facilitate an extension to the spa facilities. The overall increase in floorspace at first floor will be circa 273.5 sq.m gross. (c) All associated and ancillary works, including lighting and landscaping. The proposed development will increase the floorspace from circa 1,044 sq.m gross to circa 1394.5 sq.m gross.

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Kerry has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Park Hotel Shelbourne Street, Kenmare, Co. Kerry?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →