(1) the phased demolition of existing school buildings (2) the phased construction of a new two and three storey school building with a total gross internal floor area of 10,870m2 incorporating 37no. general classrooms, a series of 20no. support and specialist classrooms, a special needs unit, a library, PE hall, staff rooms and all ancillary accommodation including photovoltaic panels at roof level and separate external storage sheds (50m2) and refuse sore (15m2), (2) to allow the school to remain operational during the construction period, the erection on site of new temporary school accommodation units along with the retention and relocation of the existing units and, on completion of construction works, the decommissioning and removal of all temporary school classrooms, (4) the erection, also on a temporary basis during the school construction period, of an airdome (1,050m2) on the proposed school ball courts, to be used for indoor sports use, (5) the school grounds will comprise the retained existing all weather pitch, 6no. ball courts, outdoor seating and breakout areas, sensory gardens, a covered construction store area, hard and soft landscaping throughout with footpaths, public lighting, landscaping and all associated boundary treatments. (6) the existing site access from Sallins Road is to be maintained, while parking and internal movement arrangements are to include modifications to the car and bus drop-off areas, 92no. car parking spaces, inclusive of 5no. disabled spaces and 2no. electric vehicle charge points, 40no. double stacked non sheltered bicycle stands and 85no. sheltered bicycle stands, together providing in total 330no. cycle parking spaces. (7) the proposal also includes new foul and surface water drainage system works incorporating SUDS measures, attenuation, rainwater harvesting, a new substation (28m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds and all other associated site and development works / 0.2 km away / 19 January 2023