North Campus of the National University of Ireland Maynooth, Maynooth, Co. Kildare.
Planning application 17158
DecisionConditional grant
Decided12 April 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near North Campus of the National University of Ireland Maynooth, Maynooth, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22413Development on the North Campus, Maynooth University, Maynooth, Co Kildare. The development will consist of the provision of an outdoor gym facility and sports area along with all associated site development works / 0.1 km away / 01 June 2022Granted
- 17566The installation of a new flood lighting system to existing rugby and soccer pitches including all associated site and ancillary works / 0.1 km away / 30 June 2017Granted
- 23598The installation of a new compound to include three standby generators with a capacity of 1500KVA each, fuel storage tank and electrical installations, protective bund along with all associated site development works to include protective perimeter fencing to compound / 0.1 km away / 20 July 2023Granted
- 17561The construction of an extension to North East of the Electronic Engineering Building to provide accommodation for a national facility for radio science and 5 G wireless testing and research. The extension is to be comprised of; a testing chamber with associated measurement control room, service corridors, entrance lobby and connection to the existing Electronic Engineering Building including all associated site and ancillary works / 0.2 km away / 06 July 2017Granted
- 2360246To erect an 18m high monopole telecommunication structure, carrying antennas, dishes and associated telecommunications equipment including a ground based equipment cabinet surrounded by a protective cage. The adjoining existing 16 metre high floodlight structure will be removed, and the floodlights will be relocated to the proposed telecommunications monopole / 0.2 km away / 08 November 2023Granted
- 22796Development on the north campus, Maynooth University. The development will consist of the installation of 8 No. stand alone modular study pod units along with all associated site development works / 0.2 km away / 22 August 2022Granted
- 2460904For development at this c. 0.38ha site, on lands located at the Pheonix Sports and Restaurant Building. The proposed development is comprised of the partial demolition of c. 350 sqm of the south-eastern section of the existing sports building. (The Phoenix Sports Centre and Restaurant Building). This is to facilitate the construction of a new 3 no. storey sports science extension (c. 3,427sqm), comprised of lobby and reception areas; general gym; sports hall; research and teaching labs; administrative offices and associated teaching, student, and staff facilities. The development also includes removal of an existing cycle storage area and the provision of a new covered bike storage, all site development works hard and soft landscaping; plant; public lighting; signage; piped infrastructure and ducting; boundary treatments; SUDs; changes in level and all associated site development, clearance and excavation works above and below ground / 0.2 km away / 07 November 2024Granted
- 21537The construction of a single storey shed in the rear garden of the house. All associated site works and all ancillary minor works / 0.2 km away / 16 June 2021Granted