Bo Choill Road, Maganey, Athy
Planning application 17273
DecisionConditional grant
Decided08 May 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bo Choill Road, Maganey, Athy?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21291Single storey extension to side and rear of existing single storey cottage, alterations to existing cottage including the application of new rendered external wall insulation and replacement of roof, demolition of existing extension to the rear of cottage and outbuildings to side, new replacement waste water treatment system and percolation area, closing of existing vehicular entrance and provision of new recessed vehicular entrance and all ancillary site development works. / 0.1 km away / 10 June 2021Granted
- 19822The closure of two existing agricultural entrances and the provision of one new vehicular entrance and access road; the construction of two detached part single-storey part two-storey three/four-bedroom houses with detached garages and two detached part single-storey part two-storey four/five-bedroom houses with integrated garages; the provision of four Aswaflow SBR wastewater treatments systems and polishing filters, landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground / 0.3 km away / 26 March 2020Granted
- 23472To construct a dwelling house, domestic garage, waste water treatment system, percolation area, new splayed entrance and associated site work / 0.4 km away / 06 October 2023Granted
- 24602061. for 3no existing c11.6m2, c12.5m2, c7.4m2 extensions and associated alterations to retail building and stores approved by Kildare County Council under planning grant reference 08/1691. 2. Retention for c48.8m2 and c20.9m2 storage buildings to rear and side of existing retail building. 3. Retention for existing alterations to forecourt canopy, bike storage structure, roadside boundary wall finishes, forecourt reconfigurations including addition of 1no fuel dispenser/island, open air bin storage area enclosed by c1.8m high timber panelling, 18no car and 3no HGV parking spaces, and associated ground line markings. 4. Retention for 1no freestanding price signage totem and associated advertising signage. 5. Retention for Shopfront, canopy, and forecourt area signage. 6. Full planning permission for upgrade of existing wheelchair accessible car parking space and all other all other site development works / 0.4 km away / 10 September 2024Granted
- 2460093For essential maintenance and repair works to the Barrow Navigation, in accordance with Waterways Ireland’s statutory remit, comprising the following: (i) Bank Revetment & Strengthening Works, (ii) Post-Flood Spot Dredging & Maintenance Dredging, (iii) Back-drain Maintenance, (iv) Small-scale Bank Repair Works, (v) Temporary mobile welfare units, and, (vi) All works ancillary and incidental to the maintenance and repair works referred to above. A Natura Impact Statement (NIS) has been prepared in respect of the planning application and will be submitted with the planning application. Revised by Significant Further Information which consists of (i) Specialist Hydrological Review (HES Report) and Inland Fisheries Ireland (IFI) correspondence (ii) Addendum to Natura Impact Statement (NIS) (iii) Addendum to Ecological Impact Assessment (EcIA) (iv) Water Framework Directive Compliance Report (including Hydrological Assessment) (v) Updated Fisheries and Crayfish Report (including updated surveys) (vi) Landscape and Visual Impact Assessment (LVIA) (vii) Architectural Heritage Impact Assessment (AIA) (viii) Underwater Archaeology Impact Assessment (UAIA) (ix) Updated Outline Construction Environmental Management Plan (OCEMP) / 0.5 km away / 20 February 2025Granted
- 18523Development at the Public Landing Jetty Below Maganey Bridge, the development will consist of the improvement and upgrading of the existing public landing jetty by replacing the damaged and deteriorating walkway with a slip resistant decking material and repairing the river bank along the length of the jetty to prevent future erosion and undercutting of the bank. A Natura Impact Statement has been prepared for the project and submitted with the application. / 0.5 km away / 27 June 2018Granted
- 2360115For Domestic Shed and all associated site works. / 0.7 km away / 07 November 2023Granted
- 2333Retain a front porch of an existing dwelling house / 0.7 km away / 27 March 2023Granted