228 The Oaks, Newbridge, Co. Kildare
Planning application 17370
DecisionConditional grant
Decided26 May 2017
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 228 The Oaks, Newbridge, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18773Of security gates and walls as constructed and all associated site works / 0.0 km away / 22 August 2018Granted
- 181213Single storey rear extension to existing premises to be used as a store room office and staff w/c and all associated site works. / 0.1 km away / 28 November 2018Granted
- 187Extension of Duration of Planning Ref. No. 06/2880 - the residential development will consist of forty-four apartments, Block A, 12 two-bedroom and 6 three-bedroom apartments, Block B, 6 one bedroom, 9 two-bedroom and 3 three-bedroom apartments, also Block H change of apartment type in block etc.. / 0.1 km away / 20 April 2018Granted
- 2560133For widening existing vehicular entrance to provide an additional off street parking space in front garden of the existing dwelling. Works to include relocating the existing pillars, removal of grass / planting within the property, extending hard standing area within the property and all associated development works / 0.1 km away / 02 April 2025Granted
- 181163Ground floor side/rear extension with pitched roof over for use as family flat / 0.1 km away / 18 January 2019Granted
- 2561275For existing single storey detached living unit as constructed located behind the original cottage on site with permission to construct a single storey extension linking the original cottage on site with the existing detached living unit located to the rear of the original cottage as one residential unit and all associated site works / 0.2 km away / 09 February 2026Granted
- 2376Extensions and modifications of the Keadeen Hotel to provide 33 No. additional hotel rooms at first floor level (1,422 sqm) / 0.2 km away / 10 May 2023Granted
- 2460906Of existing creche facility and baby room as constructed (inclusive of 3 No. portacabin style buildings - one as w/c facility), detached covered play area with adjoining playschool rooms to cater for a total of 44 children on site as constructed and all associated site works / 0.2 km away / 19 May 2025Granted