Newtown, Enfield, Co. Kildare.
Planning application 17374
DecisionConditional grant
Decided30 May 2017
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Newtown, Enfield, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19529Install a new pedestrian walkway and associated lighting around the periphery of their lands / 0.0 km away / 03 July 2019Granted
- 21475The construction of juvenile playing pitch No. 2 and free sports area; Floodlights around playing pitches No.'s 1, 2 and free sports area; Hurling wall; Pedestrian walkway and associated lighting; And all associated site works as constructed from that granted under Pl. Ref. No.'s 11/629, 16/339 and 19/529 and for permission for the construction of a standalone single storey gym building, a spectator stand and all associated site works / 0.1 km away / 20 December 2021Granted
- 171121Extension of Duration of Planning Ref. 11/1149 construction of a bungalow, detached garage, EPS Bison treatment system and all ancillary site works / 0.3 km away / 01 December 2017Granted
- 191266The provision of a new temporary standalone pre-fabricated structure containing 1 No. classroom and sanitary facilities (floor area = 80.0sqm) to the front of the existing school building, together with all associated site works / 0.5 km away / 16 January 2020Granted
- 19506Demolition of 4 no. existing prefabricated classrooms, plant room / boiler house structure, and water tower (total floor area of proposed demolitions = 411.0 sqm), and the erection of a 3 no. classroom and ancillary spaces extension to side / western elevation, and a 1 no. classroom and ancillary space extension to side / eastern elevation ( total floor area of proposed extensions = 425.0 sqm ), of existing Main School Building ( floor area of existing Main School Building = 181.0 sqm), together with all associated site works. Revised by significant further information consisting of; development to include the retention of the 4 no. existing prefabricated classrooms and plant room / boiler house structure / 0.5 km away / 01 August 2019Granted
- 2460024For the provision of a single storey extension to the rear of existing single storey School Building (existing floor area = 610sqm) consisting of a 2no. Classroom Special Education Unit, an SET Room and a Plant Room (floor area of proposed extension = 463sqm), together with a secure external soft play area, minor internal alterations and elevational amendments and all ancillary site development works / 0.5 km away / 08 March 2024Granted
- 19653Extensions to the sides and rear of an existing dwelling. Also the construction of a new front porch and a new waste water treatment plant to replace the existing septic tank / 0.6 km away / 01 August 2019Granted
- 22702The construction of a single storey dwelling house; domestic garage; vehicular entrance, wastewater treatment unit and percolation area, and all associated site works / 0.6 km away / 01 November 2022Granted