872 Piercetown, Newbridge, Co. Kildare.
Planning application 17834
DecisionConditional grant
Decided12 September 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 872 Piercetown, Newbridge, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22199Sought for the following: (a) Sub-division of existing site; (b) New dormer style detached dwelling house: (c) New separating wall/boundary treatment; (d) New site entrance off Dara Park including pillars and wing walls etc.; (d) New connection to mains site services and all associated site development works / 0.1 km away / 04 July 2022Granted
- 221279Construction of 3 detached buildings as follows: a fixed gazebo, a coffee hub and a garden room all ancillary to existing services / 0.2 km away / 14 December 2022Granted
- 22811For the construction of a single storey extension to side and rear of existing Newbridge Family Resource Centre. The extension will consist of 3 separate phases as follows: Phase 1: Construction of a multi-use room, coffee dock, w/c and 2 family consultation rooms. Phase 2: Construction of a machinery store, offices and w/c's. Phase 3: Extension to existing childcare facility and new sensory room, connection to public foul sewer, surface water and all associated site works / 0.2 km away / 24 November 2022Granted
- 18173The construction of a two storey side and rear extension to existing semi-detached two storey house, permission to alter the front façade window arrangement (ground floor and first floor) of existing front façade and infill of existing front porch with new door and window arrangement and all associated site works / 0.2 km away / 16 April 2018Granted
- 2560640For the provision of a shed to be used as a community space for a men’s shed ancillary to existing services at Newbridge Family Resource Centre along with all associated site development and facilitating works. / 0.2 km away / 23 July 2025Granted
- 2460581For 1. Retention of (i) conversion of garage and extension to same to form a single storey/storey and half dwelling formally part of original site at 1751 Pairc Mhuire (ii) vehicular access 2. Permission for (iii) Alterations to existing dwelling including replacing garage doors with windows / 0.2 km away / 12 August 2024Granted
- 2460553For a single storey garden room to the rear of the garden which will house a garage/ home gym/ home office with a total floor area of 44m2 and all ancillary site works / 0.2 km away / 30 July 2024Granted
- 1826EXTENTION OF DURATION of planning reference 12/700; dormer/storey and a half/single storey extensions and alterations to front, side and rear of existing cottage to include: (A) New front porch, kitchen, dining, utility and living room extensions at ground floor level. (B) 2 No. bedrooms and study at first floor level (dormer/storey and a half). (C) Internal modifications to existing cottage. (D) Modifications to front facade and (D) all associated site development works / 0.2 km away / 07 March 2018Granted