3D Lakelands, Naas, Co. Kildare W91 TWY8.
Planning application 17916
DecisionConditional grant
Decided06 October 2017
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 3D Lakelands, Naas, Co. Kildare W91 TWY8.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 24170For the conversion of the front playroom to a physiotherapy treatment room and for the construction of a porch to the front, all to the existing semi-detached two storey dwelling / 0.0 km away / 03 July 2024Granted
- 20428Construction of a new 120m x 74m all-weather pitch including storage areas to replace an existing grass pitch and ball courts including new 2.4m high perimeter fencing, 6m high ball stop netting and up to 12m high ball stop netting, 6 no. new 18.3m high lighting columns around the new pitch and 1 no. new 6m high lighting column to the new car parking area, installation of a new 45kVA diesel generator in a new compound with 2.4m high perimeter fencing, new hard standing car parking spaces, erection of advertising signs around the perimeter of the new pitch, realignment of a portion of the existing emergency access road, retention and relocation of existing storage containers on the site, all associated site development works / 0.1 km away / 22 December 2020Granted
- 2660016The proposed development consists of the following: • Construction of a new 120m x 74m all-weather pitch including storage areas to replace an existing grass pitch and ball courts including new 2.4m high perimeter fencing, 6m high ball stop netting and up to 12m high ball stop netting, • Removal of basketball courts in order to facilitate proposed pitch, • 6 no. new 18.3m high lighting columns around the new pitch and 1 no. new 6m high lighting column to the new car parking area, • Installation of a new 45kVA diesel generator in a new compound with 2.4m high perimeter fencing, • New hard standing car parking spaces, • Erection of advertising signs around the perimeter of the new pitch, • Realignment of a portion of the existing emergency access road, • Retention and relocation of existing storage containers on the site, • All associated site development / 0.1 km away / 06 March 2026Granted
- 2360058Full planning permission for development at 9 Millbrook Villas, Naas, Co. Kildare The development will consist of: A) Demolition of the existing dwelling, and B) Construction of replacement dwelling, and all associated site works and services. / 0.2 km away / 08 September 2023Granted
- 22420Construction of a dormer rear extension (north), single storey double height side extension (west) and a single storey side extension (east), installation of a dormer window on south roof plane, balcony style rooflight on west roof plane, amendment of ground floor windows on west and installation of rooflights on east and west roof plane and all associated site works / 0.2 km away / 01 June 2022Granted
- 2360171For a mixed-use development at a site of c.0.5098 ha. The site is located to the north and west of no’s. 9, 10 and 11 Millbrook Villas and north of Meánscoil Iognáid Rís. The proposed development will comprise 4 no. blocks providing a total of 56 no. residential units and 3 no. commercial units. The proposed development will include: • Blocks A & B (4 storey) consisting of 49 no. apartments. Block A will comprise 26 no. apartments (15 no. 1-beds, 8 no. 2-beds and 3 no. 3-beds) and a ground floor commercial unit measuring c.112sqm. Block B will comprise 23 no. apartments (12 no. 1-beds, and 11 no. 2-beds) and a ground floor commercial unit measuring c. 84sqm. • Block C (3 storey) consisting of 3 no. two-storey, 2-bed duplexes above a ground floor commercial unit measuring c.138sqm. • Blocks D and E (3 storey) consisting of 4 no. 3 bed semi-detached houses. All residential units will be provided with private gardens/balconies/terraces facing to the north/ south/ east/ west. New vehicular and pedestrian/cyclist access will be via Corban’s Lane to the south-west and a pedestrian/cyclist only access via Corban’s Lane between Blocks B & C. Closure of the existing site access to Corban’s Lane, removal of on street car parking and upgrade to the street including provision of a new cycleway. All associated site development works, including 32 no. car parking spaces, 140 no. cycle parking spaces, open spaces, landscaping, boundary treatments, plant areas, bin stores, and services provision are also proposed / 0.2 km away / 22 February 2024Granted
- 211128(1) Installation of a new roof window to the side of the house. (2) Increase the size of the existing roof windows to the side of the house. (3) Retain existing door to the front of the house. (4) Retain the existing extension to the rear of the house and (5) Retain changes to window and door locations and sizes / 0.2 km away / 24 September 2021Granted
- 2299The removal of all existing temporary school buildings, demolition of existing school building and associated site works, construction of a new two storey primary school comprising of 16 classrooms, 3 resource rooms, 1 staff room, 2 staff offices, 1 General Purpose Hall and associated storage rooms/servery, 1 multi-purpose room, staff and student toilets, 1 library/resource room, 2 base classrooms for special needs unit, 1 central activities space and ancillary accommodation/plant rooms, all associated external works including provision of 1 No. new vehicular/pedestrian entrance to north of site from Corban's Lane and 1 No. new vehicular/pedestrian to west of site from Loch Bui, internal bus set-down and all footpaths, staff car parking, cycle parking, playing fields, 2 no. ball courts, 1 junior play area, 1 soft play area, bin stores, storm drainage system, landscaping, and boundary treatments / 0.2 km away / 29 November 2022Granted