Irish Lamp Recycling, Woodstock South Industrial Estate, Athy
Planning application 181364
DecisionConditional grant
Decided14 January 2019
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Irish Lamp Recycling, Woodstock South Industrial Estate, Athy?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19715To renovate existing annex to commercial building including altering roof level, new exterior cladding, glazing and doors, including signage and all associated and necessary site works / 0.0 km away / 16 August 2019Granted
- 18906Retention of an existing hardcore surface, erection of 2.4m high cage containing 2.3m2 floor space and accommodating a gas meter, and an underground gas supply pipe from the mains system located on the public road into the site. Planning permission is also being sought for a future development consisting of alterations to the existing site access, construction of a hard stand concrete surface, installation of a gas compressor, provision of a store for bottled gas, provision of a gas dispensing unit, erection of palisade security fencing around the perimeter of the site, and use of the overall development as a gas store and depot and as a gas refuelling station for private industrial vehicles (for use of the applicant only) and all associated site and development works and services / 0.1 km away / 07 November 2018Granted
- 22282To construct a warehouse extension to rear of the existing factory, to enlarge existing site entrance and all associated and necessary site works / 0.1 km away / 21 October 2022Granted
- 2349For the development consisting of an energy decarbonisation project that will include the installation of associated equipment including: a (2No containerised heat pump structures, each 13.7m x 7.3m x 5.77m high b)1No containerised switchroom 12.2m x 4.8m x 3.0m high c)1No containerised heat pump structure 13.7m x 4.6m x 8.7m high d) Transformer bund containing 5No transformers e) 2No hot water buffer tanks 14.7m high x 3.7m diameter f)1No waste water storage tank 21m high x 8m diameter g) 1No cooling tower and associated basin 4.5m x 14.85m x 8.2m high h) A stainless steel hot air recovery duct 7m wide x 4m high to be located along the top and north side of the Seeger Kiln Building. I) Repairs to the stone wall along the William Street Upper site frontage and the replacement of the existing fencing with a metal railing J) Replacement of the existing metal gates along the William Street Upper site frontage with painted hardwood timber gates and signage. The site activity is subject of an Industrial Emissions Licence application. Following a requirement by the Planning Authority, a Natura Impact Statement has been submitted / 0.1 km away / 06 June 2023Granted
- 18479A 10 year planning permission for development which will consist of: (1) The demolition of a portion of an existing barley intake building and storage building; (2) The construction of a new malting plant comprising: an energies building (400.5 sqm and 16.6 metres high); a kiln vessel (594 sqm and 10.8 metres high); a steeps building (496.6 sqm and 20.4 metres high); 2 No. germination vessels (830 sqm and 10.2 metres high); a 300 cubic metre process water tank (5.7 metres high); and ancillary overhead conveyors at 11.5 metres above ground level: (3) The construction of a wastewater balance tank (167.3 sqm and 5.7 metres high): (4) The construction of 3 No. combined heat and power units (228 sqm and 7.4 metres high): (5) The construction of a barley intake building (145.7 sqm and 18 metres high); (6) The construction of a heat recovery unit for the Boby Kiln to be located on top of the existing Boby Tower (162 sqm) to a height of 21.6 metres above ground level; (7) The construction of a filter enclosure (60.7 sqm and 14 metres high); (8) The construction of a malt screen housing (65 sqm and 18.0 metres high); (9) The construction of a malt outloading structure with overhead storage bins (174.3 sqm and 23 metres high) with associated overhead conveyors; (10) 2 No. buffer bins (50 sqm and 20.7 metres high); (11) The renovation of Plewman’s House and the construction of a 76sqm board room extension and a 310 sqm administration building extension; (12) The construction of a 29 No. space car park with disabled and electric charging spaces adjacent to Plewman’s House; (13) The construction of an access road, footpath and vehicle entrance from the Woodstock Industrial Estate road; (14) An upgraded surface water management system to include a new surface water attenuation pond; 1 No. surface water screen; 1 No. hydrodynamic grit separator; and 1 No. hydrocarbon interceptor; and (15) All other site development works including the provision of ancillary access roads, hardstands, conveyors and underground services required to facilitate the development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application and the EIAR and NIS will be available for inspection or purchase at a fee not exceeding the reasonable cost of making a copy during office hours at the offices of the Planning Authority, for development / 0.2 km away / 29 August 2018Granted
- 231017To construct a storage shed at our grain intake facility (PL Ref 20/1555) and associated site works. Revised by Significant Further Information which consists of; retention to amendments to permitted development (20/1555) to include; (a) Extension of Site Boundaries to include adjoining buildings. (b) Layout of Roadway & Operation of the facility as constructed. (c) 3 no Additional Grain Storage Bins. (d) Control Room / Dust Room. (e) Weighbridge Locations & Hut. (f) Water Storage Tank. (g) Generator Storage Room. / 0.2 km away / 14 October 2024Granted
- 191024The construction of a malt production process building (Nordon Steeps Building) along the north eastern boundary of the site as a replacement of the existing building that has collapsed; a canopy and a 500cu. Mm. water storage tank / 0.2 km away / 06 November 2019Granted
- 24602661) Demolition of existing canteen building and 2 no. Barley storage silos (10.5 m diameter x 14 m high) and alterations to existing access gantries located on top of silos; 2) Construction of new malting plant comprising – 1 no. germination vessel (23 m diameter and 10.1 m high) and ancillary overhead grain elevators and conveyor gantries; 2 no. barley intake silos (each 8.4 m diameter and 22.835 m high); and alterations to the Malt Screen Building approved under reference 18/479 (ABP-302630-18) (775 sq. m. x 21 m high) containing barley screening equipment, grain elevators and all associated processing equipment connected to kilning facilities and malt silos by existing conveyor systems; 3) Construction of a single storey stores building (414.2 sq. m. and 8 m high); 4) Construction of a single storey modular staff facilities (offices, welfare facilities, canteen) building (208.5 sq. m. and 3.2 m high) and 14 no. associated car parking spaces for a temporary period of five years; 5) Expansion of existing on-site waste water treatment facilities including construction of 2 no. wastewater treatment buildings (355.6 sq. m. and 10.1 m high; and 436 sq. m. and 9.7 m high) to include internal wastewater processing tanks and screening equipment, 2 no. balance tanks (each 8.5 m diameter and 6.4 m high), extension to existing elevated dewatering press structure (5.8 m x 12.2 m long x 12.7 m high), and installation of associated equipment within the existing WWTP Stores and Electrical room and minor works to the Tank Room (protected structure) consisting of service connections through existing louvered openings to new wastewater treatment building, and 6) all other site development works including alterations and extensions to the existing site hardstands, external drainage, pedestrian ways etc and underground services required to facilitate the development. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence (Reference P1129-01). A Natura Impact Statement (NIS) will be submitted to the Planning Authority with the application / 0.2 km away / 21 May 2024Granted