Unit JB Beech Avenue, Naas Enterprise Park, Newhall
Planning application 18168
DecisionConditional grant
Decided12 April 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit JB Beech Avenue, Naas Enterprise Park, Newhall?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 181077(i) Part change of use of existing warehouse at ground and first floor level for provision of new offices; (ii) Alterations to existing North, West and South West elevations to include new entrance and canopy with associated doors and windows at ground and first floor; (iii) New palisade fencing, truck wash and diesel refilling area including all associated site development works / 0.1 km away / 26 October 2018Granted
- 23599An extension to an existing industrial building comprising 808.24sqm of warehouse/storage use, construction of new external fire escape stairs to the north elevation, reconfiguration of existing internal layouts and associated site works / 0.1 km away / 11 October 2023Granted
- 226421 no. advertising signage to the front façade and 1 no. advertising signage to the rear façade of existing light industrial unit and all associated development works / 0.2 km away / 14 July 2022Granted
- 181147The development will consist of: (1) part change of use from existing warehouse to new bus service and maintenance garage, (2) demolition of existing first floor offices and reconfiguration of existing ground floor offices. (3) alterations to existing Northeast elevation including removal of two no. existing roller shutter doors, introduction of two no. new 5.5m wide roller shutter doors and 1 no. new emergency exit door. (4) alterations to existing Southwest elevation including removal of 1 no. existing emergency exit door, introduction of two no. new emergency exit door and introduction of new louvred wall vent. (5) new bus wash and diesel refuelling area (6) new palisade fencing. (7) and all associated site development works. / 0.2 km away / 24 January 2019Granted
- 25122For high-level external signage (2 no.) to the southeast and northeast elevations with all associated site works / 0.2 km away / 28 August 2025Granted
- 2461065For alterations to front elevation cladding, provision of new glazing/window and all associated development works / 0.3 km away / 09 December 2024Granted
- 2560838For the demolition of internal and external features to facilitate the subdivision of the existing warehouse (22,819sqm GA) into 2 no. separate warehousing units (Unit A: 10,979sqm GFA + Unit B 7,312 sqm GFA). The demolition includes existing internal office features, existing internal dividing walls, existing 2nd floor, existing mezz structures, 2 no. external cabins, and existing external yard features; The subdivision of an existing warehouse into 2 no. separate warehousing units, Unit A and Unit B; The development of an extension to the existing warehouse of 244 sqm to accommodate 10 no. dock levellers to serve the proposed Unit A on the southern elevation; The provision of 8 no. dock levellers to serve the proposed Unit B on the northern elevation'; The development internally of 1 no. 2-storey office, measuring 686 sqm in total, in proposed Unit A, and 1 no. 2-storey office, measuring 850 sqm in total, in proposed Unit B; the development of 1 no. Sprinkler Reservoir (approx. 110 sq. m GFA, 11.500m in height), and 1 no. Pump House (approx 68sq,m GFA and 3.8m in height); The provision of 4 no. external bin enclosers (2 no. serving Unit A and 2 no. serving Unit B); The development of a 2 no. new vehicular access points from Lime Drive to the proposed service yard associated and the proposed car park associated with the proposed Unit A; The development of 1 no. pedestrian crossing on Lime Drive; The provision of a total of 98 no. car parking spaces across 2 no. car parks (51 no. spaces associated with Unit A and 47 no. spaces associated with Unit B); The provision of a total of 54no. cycle parking spaces across 2 no. cycle parking areas (30 no. spaces associated with Unit A and 24 no. spaces associated with Unit B); The development of a service yard with 11 no. trailer parking spaces accessed via Lime Drive' and all associated site development works on a site of approx., 3.49ha (referred to as 'Unit T4') bounded generally by Lime Drive / 0.3 km away / 27 November 2025Granted
- 201055The amalgamation of structures and property at 1b and 1c Willow Drive, Naas Enterprise Park. The proposed development will include a double height, single storey building to link Units 1b and 1c and reconfiguration of space inside both buildings to create a single, operational, production facility including warehouse storage and ancillary office space (with an internal link between the existing ancillary office space in Units 1B and 1C within the link building); a security hut; rising barriers at access points on the site; cycle parking and smoking shelters and ESB substation building to the south of the site; mechanical plant compounds to the west of Unit 1c; new dock levellers; two silo structures to the west of Unit 1c (including the relocated silo currently located to the east of Unit 1b); two sprinkler tanks and pump house to the north of the site; an HGV maintenance and washing area to the north of the site; gas meter building to the south west of the site; reorganization of parking to the front of the building; removal of structures in the rear yard of Unit 1b and ancillary demolition to facilitate the development; new boundary fencing; all proposed signage; all ancillary underground drainage to facilitate the development and all other ancillary works or uses such as revised HGV parking and waste handling areas to the north of the units / 0.3 km away / 11 January 2021Granted