Tipper Road, Naas East, Co.Kildare
Planning application 18840
DecisionConditional grant
Decided06 September 2018
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Tipper Road, Naas East, Co.Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 195Partial demolition of the garden shed in the rear garden (9sqm), the construction of a single storey extension to the rear of the dwelling (37sqm), alterations to the windows at first floor level to the rear elevation and all associated ancillary, landscaping and site development works / 0.0 km away / 28 February 2019Granted
- 197411) part-demolition (only) of the existing single storey, single family dwelling. 2) proposed extension, to said dwelling to facilitate the construction therefrom of 3) two, detached, two storey (dormer-style) single family dwellings with 4) all associated site works, landscaping and boundary walls. The existing vehicular entrance unto the Tipper Road is to be used to allow access to two independent entrances, located within the site, into each new individual single family dwelling and site. (The existing single-storey studio building on the overall site is unaffected by the development and will remain within one of the sites). Additional works to include inter alia connections to the existing town foul sewer; soakaways to facilitate surface water disposal as required, parking to each site, landscaping and internal boundary walls along with all other ancillary site works / 0.0 km away / 22 August 2019Granted
- 18137Removal of single storey boiler house to rear (3sqm) - construction of new single storey extension to storage shed to rear (4.5sqm) - change of use of storage shed to rear to guest accommodation - construction of new single storey extension to front of house (4.5sqm) - provision of new window to side at first floor level - provision of new rooflight to side - all associated ancillary, landscaping and site developments works / 0.0 km away / 05 April 2018Granted
- 2660258For (a)The widening of an existing c. 3 m wide vehicular access by c. 1.25 m; and (b) All associated site development works. / 0.1 km away / 01 May 2026Granted
- 181279Construction of single storey extension to the rear and side with hip and flat roof to tie into existing garage, change of use from garage to study room, internal alterations and all associated ancillary site works / 0.1 km away / 12 December 2018Granted
- 24396For; (a) single storey extension to the side of the property east. (b) single storey extension to side of property west. (c) modifications and adjustments to the front of property north. (d) single storey extension to rear of property south / 0.2 km away / 21 February 2025Granted
- 21702The following modifications to an existing dwelling house: (a) New single storey extension to front of the existing dwelling; (b) 2 No. new single storey extensions to rear of the existing dwelling; (c) Revised window arrangement; (d) Removal and redesign of the existing roof to include for increased pitch; (e) Internal modifications, connection to existing services onsite and all associated development works / 0.2 km away / 06 July 2021Granted
- 2496Sunroom extension to side of existing dwelling / 0.2 km away / 03 May 2024Granted