Ovidstown Development Site, Ballyvoneen, Enfield
Planning application 1894
DecisionConditional grant
Decided23 January 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ovidstown Development Site, Ballyvoneen, Enfield?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20543To amend application 18/94 at Ovidstown, Ballyvoneen, Enfield, Co. Kildare. The development will consist of a ground mounted solar photovoltaic (PV) farm to generate renewable electricity on a 13.6ha site and to extend the consent to 35 years, which comprises an access gate, security fencing, solar arrays and racking system, 2 no. electricity substations, grid connection building, temporary construction compound, CCTV cabling, hardstanding, new access track and ecologically beneficial landscape works / 0.3 km away / 22 September 2020Granted
- 171222A 10 year permission for development on lands which will consist of an extension to the solar PV farm granted permission under Register Reference 16/1265 comprising the construction of approximately 25,300 No. photovoltaic panels on ground mounted frames within a site area of 11.50 hectares and associated ancillary development including 4 No. transformer stations, 4 No. auxiliary transformer stations, 4 No. inverters, 1 No. CCTV security camera mounted on 4 metre high pole, perimeter security fencing (2 metres high) and internal access tracks / 0.6 km away / 06 February 2018Granted
- 171138(a) Erection of bungalow type dwelling; (b) Erection of garage/fuel store for domestic use; (c) Installation of septic tank and percolation area and all associated siteworks / 0.9 km away / 16 January 2018Granted
- 20661Alteration and relocation of vehicle entrance as granted under previous planning grant 04/1576 / 1.1 km away / 17 August 2020Granted
- 19671A new single storey dwelling, new recessed entrance, new waste water treatment system and all associated site development works / 1.2 km away / 24 October 2019Granted
- 1864(a) Erection of dormer type dwelling; (b) Erection of garage/fuel store for domestic use; (c) Installation of proprietary waste water treatment system and percolation area and all associated siteworks / 1.3 km away / 21 May 2018Granted
- 24292For (a) detached single storey three-bedroom dwelling (ridge height 6.2m), (b) provision for upgrade works to existing farm access road to provide new vehicular entrance, (c) installation of a well to front garden and effluent treatment system to rear garden and all associated site works. Revised by Significant Further Information which consists of (a) Revised site plans indicating revised siting of proposed dwelling and indicating setback distance from motorway; (b) Revised landscape plan and report indicating planted screening along boundaries; (c) Rationale for location of proposed development; (d) Acoustic Design Statement demonstrating noise levels; (e) Certificate of Titles and associated Folios of all lands under the Applicant's ownership; (f) Letter from Westmeath Co. Co. confirming legal right of way; (g) Detail of proposed road improvement from Westmeath County Council National Roads Office / 1.4 km away / 22 July 2025Granted
- 2561103EirGrid PLC, with the consent and approval of the Electricity Supply Board (ESB), intends to apply for permission for works to uprate the existing Rinawade – Dunfirth Tee – Kinnegad 110kV overhead line (OHL). Within County Meath, the proposed development will take place within the following townlands: JARRETSTOWN, WALTERSTOWN, MOOR OF MEATH, RATHLEEK, GRANGE, BOGGANSTOWN, CAPPAGHCREEN, BROWNSTOWN, SALESTOWN, AFFOLLUS, KILGRAIGUE, HARRISTOWN, PORTERSTOWN, KILCLONE, KIMMINS, BARROCKSTOWN, BALLYMAGILLIN, MULHUSSEY, FERRESTOWN, RODANSTOWN, BATTERSTOWN, DOLANSTOWN, CALGATH, BALFEAGHAN, KILGLIN, FERRANS, CASTLEJORDAN, GORTNAHORNA, KILLASKILLEN, CLONGALL, KNOCKERSALLY OR COLEHILL. The Rinawade - Dunfirth Tee - Kinnegad 110 kV OHL circuit runs through County Meath, County Kildare and County Offaly. It is 54 km in length and travels from Kinnegad 110 kV substation in Killaskillen (County Meath) and traverses southeast where a short loop into Dunfirth 110 kV substation in Dunfirth (County Kildare) exists. The line then continues southeast where it terminates at Rinawade 110kV substation in Rinawade Lower (County Kildare). The OHL has a total of 249no. supporting structures. Within the functional area of Meath County Council, there is 23.16 km of the existing OHL circuit, with 107 no. structures. Within the functional area of Kildare County Council there is 30.66 km, with 140 no. structures, and within the functional area of Offaly County Council there is 0.42 km, with 2 no. structures. Separate planning applications will be lodged with Kildare County Council and Offaly County Council. The proposed development within Co. Meath will comprise: • the replacement (“restringing”) of the existing OHL circuit conductor wires with a new higher capacity conductor between structure numbers 1 - 37, 185 - 214, and 218 - 223; • the replacement of angle mast in-situ at 1no. location, with a new angle mast; • the strengthening of tower foundations at 3no. locations; • the strengthening of towers (i.e., member replacement) at 5no. locations; • the painting of towers at 7no. locations; • shear block remedial works of towers at 1no. locations; • the replacement of polesets at 38no. locations, with similar structures. There will be no change in height at 12no. poleset replacements. There will be height increases between 0.1m and 2.0m at 26no. poleset replacements. • the replumbing of polesets at 11no. locations; • the replacement of insulating and ancillary hardware at / 1.4 km away / 05 December 2025Granted