Silliothill, Kilcullen, Co. Kildare.
Planning application 19145
DecisionConditional grant
Decided12 April 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Silliothill, Kilcullen, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2229Proposed development consists of a detached, single-storey dwelling along with ancillary development consisting of improvement works to existing vehicular access, on-site treatment system with associated percolation area, driveway, landscaping, boundary treatment and associated site works (including regrading of ground levels) / 0.2 km away / 28 February 2022Granted
- 19713Demolition of existing single storey domestic garage to allow for the construction of single storey side extension to existing bungalow to be used as a self-contained family unit and all associated site works. Revised by significant information consisting of; permission for demolition of existing single storey domestic garage to allow for the construction of single storey side extension to the existing bungalow to be used as a self-contained family unit. Replacement of existing septic tank and percolation area with secondary effluent treatment system and all associated site works / 0.3 km away / 28 November 2019Granted
- 20140(1) Extensions to Tile Manufacturing Building previously permitted under reg. Ref. 17/1224 and ABP Ref. 302199/18 comprising of: (a) Lean-to extension for carpentry storage (99sqm gross floor area, max 8.5m high) to the south eastern building elevation; (b) Lean-to extension for casting components/build materials storage (630sqm gross floor area, max 8.5m high) to the south eastern building elevation; (c) Two storey (max 9.5m high) extension consisting of welfare/office facilities at mezzanine level (270sqm gross floor area) and additional storage at ground floor level (270sqm gross floor area) to north eastern building elevation; (d) New wastewater treatment system and percolation area. (2) Construction of two storey office extension (298sqm gross floor area, 7.6m high) to the existing south western elevation of the Dry Batch Mortar Building also previously permitted under Reg. Ref. 17/1224 and ABP Reg. Ref. 302199/18. (3) A new bagging shed (240sqm gross floor area, max 8.0m high). All associated site works. It is proposed that the duration of the proposed development would run concurrent with that of Planning Ref. 17/1224 and ABP-302199-18, which is due to expire on 17/02/2039, development / 0.5 km away / 14 May 2020Granted
- 22347A new extension (max 11m high with a gross floor area of 3,000m²) to an existing manufacturing building (previously permitted under Reg. Ref. 20/140; Reg. Ref. 17/1224 and ABP Ref. No. 302199-18) to provide storage for precast concrete products and all ancillary works / 0.6 km away / 18 October 2022Granted
- 2461046For a solar farm to be installed over restored landfill with an export capacity of approximately 4.5MW comprising photovoltaic panels on concrete ballast supported frames, construction of and connection to a new single-storey ESB Sub-Station / Switch Room building, installation of 3 No. transformers, ducting & electrical cabling and all associated ancillary works and services / 0.7 km away / 05 December 2024Granted
- 20324A planning application area of c. 20.6 hectares consisting of a combined proposed extraction area (Area 1, c. 10.3 hectares) and proposed early reinstatement area (Area 2, c. 10.3 hectares). Area 1 will consist of an extension to the west of the existing sand and gravel pit with an extraction footprint of c. 8.7 hectares. The sand and gravel extraction (c. 2.4m tonnes) will be dry working above the water table. Stripping and storage of topsoil and overburden materials from the extension lands for reuse in the restoration works. Restoration of the extraction area will be to a beneficial agricultural after-use and form part of the restoration of the extraction area, as permitted under planning ref. 17/1224 (ABP-302199-18). Area 2 will consist of an amendment to the permitted extraction area of planning ref. 17/1224 (ABP-302199-18) by the omission of a c. 4.7 hectare area and the early reinstatement of a partially extracted c. 2.7 hectare area of the existing permitted c. 7.4 hectares extraction area. It is proposed that the duration of the proposed development would run concurrent with that of planning ref. 17/1224 (ABP-302199-18), which is due to expire on 17/02/2039. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application / 0.7 km away / 02 July 2020Granted
- 171224The continuance of the following development previously permitted under Kildare County Council (KCC) Reg. Ref. 07/707; ABP Ref. PL09.226792 and KCC Reg. Ref. 14/920. (1) Extraction of sand and gravel and processing on c.85.9 hectares for a 20 year period, with control cabin and canteen facilities, electricity substation, bunded fuel tanks, Electricity Supply Board substation and switch-house and septic tank, aggregate crushing, washing and screening plants and the continued use of the internal access road and existing site access onto the R448 with a further two years to complete site restoration to agriculture. The development proposes progressive restoration throughout the life of sand and gravel extraction. (2) Dry Batch Mortar Plant comprising structures and pieces of plant and machinery:- loading ramp and receiving hopper; a feed conveyor; a drying plant building (c8.6 metres high); external bucket elevators (up to c24.8 metres high); a storage and mixing plant building (c23.5 metres high) (housing plant and machinery); two number finished product storage silos with bulk loadout machinery (c20.5 metres high); prefabricated office; prefabricated compressor container; prefabricated control and switchgear container; a bunded and covered fuel tank; truck and car parking areas. (3) Storage at the existing Overburden Storage Mound (area of c3.4 hectares) which is covered with topsoil and is grass seeded and wil ultimately be used in the restoration of the aforementioned sand and gravel development site. (4) Dry Mortar Bagging Plan and Storage Hall Structure (c7 metres high). (5) Existing weighbridge and wheelwash within the development site. (6) Covered aggregate storage bays, a sand storage shed and a bagging shed. Permission is also sought for the provision of new works including an office building (and two proprietary sewage effluent treatment systems), dry batch mortar plant extension (including plant and machinery), tile manufacturing plant; associated switch-house; car parking; provision of two weighbridges; covered storage sheds; rerouting of internal access road to plant site; the demolition of a storage shed and weighbridge; extraction of sand and gravel to the south-west of previously permitted extraction area and extension to existing overburden storage mound; landscaped screening berms and overburden storage mounds along perimeter of the site. All development will be within the c85.9 hectare Kilsaran Concrete landholding for a period of 20 years / 0.7 km away / 04 July 2018Granted
- 18969A solar farm to be installed over restored landfill with an export capacity of approximately 3MW comprising photovoltaic panels on ground mounted frames, connection to existing single-storey ESB Sub- Station / switch room building, installation of 3 No. transformers, ducting and underground electrical cabling and all associated ancillary works and services. Revised by significant further information consisting of; construction management plan detailing construction techniques / 0.8 km away / 21 August 2019Granted