Blackhall, Clane, Co. Kildare
Planning application 201297
DecisionConditional grant
Decided11 August 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Blackhall, Clane, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211756For modifications to previously granted Planning No. 20/759. The Modifications consist of Alterations to previously granted Two Storey Dwelling, Domestic Garage, Secondary effluent Treatment System, Utilisation of Existing Recessed Entrance and all Associated Site Works / 0.1 km away / 06 April 2022Granted
- 23643(a) The construction of a new part two storey part single storey dwelling with a total floor area of 396.8m2; (b) The provision of a new waste water treatment system and associated percolation area; (c) Vehicular site access being provided off an existing recessed entrance approved under pl. reg. ref. 20/1297; (d) The construction of a new single storey stable building with at total floor area of 109.1m2 that will accommodate 6 stables boxes and a tack room & feed store; (e) The construction of a manure store and underground soiled water tank to serve the stable building; and (f) All associated site development works / 0.1 km away / 01 August 2023Granted
- 20759The construction of a two storey detached house, single storey domestic garage, secondary effluent treatment system, utilisation of existing recessed entrance and all associated site works / 0.1 km away / 05 November 2020Granted
- 22373(1) Retention of development as constructed including amendment to site boundary. (2) House and stables constructed in different location to that permitted under Planning Reference 03/2121. (3) Red line boundary is changed from original under Planning Referenced 03/2121 / 0.2 km away / 17 May 2022Granted
- 2461039To (i) Renovate and extend the existing two storey dwelling house, proposed extensions to include bedrooms, kitchen, living area, home office / study, games room, gym, swimming pool, circulation and utility spaces. (ii) Upgrade the external elevations of the existing stables. (iii) all associated site works / 0.2 km away / 02 May 2025Granted
- 2460051For single storey dwelling, extended access driveway taken from existing family home entrance, landscaping and screen planting, effluent treatment plant and all associated site development works / 0.3 km away / 13 March 2024Granted
- 2561004For the creation of a new vehicular entrance to the site which will serve as the proposed permanent domestic entrance to the dwelling including all associated site works and services / 0.3 km away / 28 October 2025Granted
- 181557Construction of a single storey side extension to existing detached two storey house (Stephen Kilduffs House) for use as a family unit for Michael & Bregee Kilduff, Permission to upgrade and re-locate existing secondary effluent treatment system on site to accommodate the proposed and existing development and all associated site works / 0.5 km away / 20 May 2019Granted