Salesian College Celbridge, Moortown, Celbridge
Planning application 20577
DecisionConditional grant
Decided28 July 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Salesian College Celbridge, Moortown, Celbridge?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22419(1) A new synthetic Astro Platform 102 metres x 66 metres to be used as an all-weather soccer pitch at the location of the existing grass soccer pitch which is located to the rear and left hand side of our grounds when viewed from the public road. (2) Fencing to the perimeter of the pitch which consists of 2.40 metres high of double 868 mesh with 2.60 metres high ball stopping netting giving a total height of 5.00 metres. (3) To the rear of the goals at either end of the pitch for a distance of 28 metres the 2.60 metres high ball stopping netting is to be increased to 10.60 metres giving a total height of 13.00 metres at these two locations. (4) To lay a temporary hardcore and gravel construction roadway to the right hand side of our College when viewed from the public road. Also, a Contractor's compound located beside the existing hard surface basketball court located to the rear of the site. (5) Eleven number lateral drains under the proposed Astro Pitch connected to a main drain and discarding to a soakaway designed and constructed to BRE 365 and approved by the County Council. (6) All ancillary ground works associated with the above project. The above works to be carried out on our site / 0.1 km away / 01 June 2022Granted
- 17190Existing prefabricated classroom accommodation block measuring 395 Sq.m incorporating 4 no. resource rooms, 4 no. meeting rooms, ancillary stores (2) and a toilet block / 0.1 km away / 19 April 2017Granted
- 20307100STRATEGIC HOUSING DEVELOPMENT (ABP Decision): 467 Residential Units. 199 No. Houses, 216 No. Apartments, 52 No. Duplexes, Childcare Facility, gym, café and retail unit and associated site works. / 0.1 km away / 08 August 2020Granted
- 22418(1) 6 No. 15 metre high columns to the perimeter of our soccer pitch which is located to the left and rear of our site when viewed from the public road. These columns are to be used to mount floodlights to illuminate the pitch. (2) All ancillary ground works associated with the above project. The above works to be carried out on our site / 0.2 km away / 01 June 2022Granted
- 19918Construction of new single storey ASD unit 659 sq.m to rear of existing school buildings comprising classrooms, tuition rooms, activity rooms, sensory & calm rooms, consultation and meeting rooms, office, storage and WCs; single storey enclosed link corridor 117 sq.m to existing classroom building, outdoor play area, new internal vehicular access surface and set-down area and all associated site works / 0.2 km away / 19 December 2019Granted
- 2560543For planning permission to modify a permitted Strategic Housing Development (SHD) permission (ABP-307100) by way of a planning application for a Large-Scale Residential Development (LRD) permission on a site of c12.68 hectares located on lands at Kilwoghan Woods, in the Townland of Crodaun, Celbridge, Co. Kildare. The minor modifications to the permitted SHD consists of (1) The change of permitted House Type A to House Type H (12 no. units) (2) The change of permitted House Type A1 to House Type H1 (2 no. units) (3) The change of permitted House Type A2 to House Type H2 (2 no. units) (4) The change of permitted House Type B2 B3 to House Type F.a and F.b (4 no. units) and all associated site development works / 0.2 km away / 15 July 2025Granted
- 181325The use of unit A11, second floor, building A, Celbridge M4 Business Park, as an Adult Training Centre and associated internal work. Unit A11 is 970m2 in area. Permission was granted for the development works associated with unit A 11 (ref;05/2210) / 0.2 km away / 20 March 2019Granted
- 22617Sought for: The use of existing attic space, Building A, Celbridge M4 Business Park, as a Youth Training Centre, associated internal work and 27 rooflight windows. The proposed use is 1200 sqm in area. Permission was granted for the existing development works associated with Building A (Ref. 05/2210) / 0.2 km away / 19 October 2022Granted