Barnhall Road, Leixlip, Co. Kildare
Planning application 20873
DecisionConditional grant
Decided17 December 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Barnhall Road, Leixlip, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2621Extension of Duration: 20/873: the construction of a logistics warehouse with ancillary office accommodation (total c. 25,268 sqm) to an overall height of 14.86 metres. The warehouse element of the development is principally single storey including an ancillary mezzanine level (554 sqm). The ancillary offices, comprising c. 1,737 sqm, are provided over three storeys and include toilets, change rooms, showers, cafeteria, gym, plant areas and circulation spaces. The proposed development will also include: the provision of a new vehicular access from Barnhall Road roundabout with ancillary associated entry/exit gates, access road and footpath; 179 no. surface car parking spaces including electric vehicle charging stations and 18 no. bicycle parking; solar pv panels on the warehouse roof; hard and soft landscaping; signage; sprinkler storage tanks and pump house; an electrical substation (c. 54 sqm); and all ancillary works including boundary treatments, street lighting, site excavation and development works above and below ground. The site is principally bounded by: Liffey Business Campus to the north; Barnhall Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west. At this site of c. 8.19 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus) / 0.0 km away / 02 April 2026Granted
- 221096Development of 4 No. 20 kV ESB double substations at four sites of c. 591 sqm in total (Site 1, c. 138 sqm adjacent to Building 4; Site 2, c. 138 sqm adjacent to Building 2 and Building 5; Site 3, c. 138 sqm adjacent to Building 5; and Site 4, c. 177 sqm partially within Building 9, at the Kildare Innovation Campus (formerly known as the Hewlett Packard Campus) Barnhall Road, Leixlip, Co. Kildare. The wider Kildare Innovation Campus is c. 80 hectares. The wider Campus is principally bounded by: Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and grounds associated with Castletown House to the west. The proposed development will consist of: the construction of 3 No. standalone ESB double substations and associated LV switch rooms (Substations No. 1-3) of c. 3m in height, c. 4.8m in depth, and c. 17.8m in width, with an individual gross floor area of 57.5 sqm; and all associated works above and below ground. Substation No. 4 (gross floor area of 57.5 sqm) will include: internal alterations to the existing Campus Building No. 9; associated LV switch rooms; the removal of existing louvre and replacement with substation access doors on the southeast elevation; access path; and all associated works above and below ground. The cumulative gross floor area of the development will be 230 sqm / 0.1 km away / 01 February 2023Granted
- 20882Replacement modular constructed prefabricated, single storey building, (approximately 370 sqm) consisting of 4no classrooms with WC facilities and office and storage room which was damaged by fire / 0.2 km away / 01 December 2020Granted
- 21730Development at a site of c. 0.516 hectares at Liffey Business Campus (formerly known as the Hewlett Packard Campus). The proposed development will consist of the construction of a new vehicle access to the rugby club inclusive of associated pedestrian footpaths; modification to the rugby club’s existing vehicle access to replace it with a shared pedestrian and cycle access and the provision of a raised pedestrian/cycle crossing on Barnhall Road; the expansion of the existing car park for the rugby club to accommodate 38 No. surface car parking spaces as well as hard and soft landscaping and all ancillary works including boundary treatments, site excavation and development works above and below ground / 0.3 km away / 21 February 2022Granted
- 2147(a) Permission for 1 number new lighting standard providing illumination to the existing training pitches. (b) Retention Permission for 19 number existing lighting standards to the perimeter of the site to include for the relocation of 2 number existing lighting standards and the re-lamping of all fittings throughout with energy efficient LED lamps and all associated site works / 0.3 km away / 10 March 2021Granted
- 23601723 No lighting pole standards with energy efficient LED lamp/flood lights no more than 12.5 metres high providing illumination to existing training pitches inclusive of all associated site works / 0.3 km away / 14 December 2023Granted
- 2360199Will consist of a proposed single storey extension to the east of the existing clubhouse, comprising of 4 no. changing rooms with shower facilities attached, 2 no. referee rooms with a shower room attached and a general storeroom, inclusive of all associated site works / 0.4 km away / 17 October 2023Granted
- 2060The proposed development specifically relates to Building No. 3 and Building No. 4 located to the north-east of the centre of the site. (No alteration to the balance of the development is sought by this Application). The development for which retention permission is sought consists of: the change of use of Building No. 3 from its permitted warehouse use (Reg. Ref. 95/923) to manufacturing use (4,421 sq. m gross floor area including ancillary offices at ground floor and first floor level); and the change of use of part of Building No. 4 from its permitted manufacturing use (Reg. Ref. 95/923) to office use (9,002 sq. m gross floor area ). The development for which retention permission is sought also consists of: the provision of ancillary office space at first floor level within Building No. 4 (246 sq. m gross floor area); and all other associated site development works above and below ground. The site is principally bounded by; Barnhall Road to the north; Celbridge Road to the east; Barnhall Rugby Football Club to the south; and by grounds associated with Castletown House to the west / 0.4 km away / 23 March 2020Granted