Coolroe, Athy, Co. Kildare
Planning application 20993
DecisionConditional grant
Decided30 November 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Coolroe, Athy, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 23554To construct an extension to dwelling house, necessary renovations to same house, construction of a domestic garage/storage shed, installation of new wastewater treatment system, relocation of existing entrance and associated site works / 0.5 km away / 02 October 2023Granted
- 2360450To construct an entrance to Dwelling house and associated site works. This entrance supersedes that of Planning Ref:- 23/544 / 0.5 km away / 06 February 2024Granted
- 181183An energy storage facility to provide services to the national grid system on a 2.32ha site comprising: 1 No. sub-station building and associated transformers and grid compliance equipment, 18 No. battery storage containers, 18 No. combined power conversion system and transformer units, 18 No. HVAC (Heating, Ventilation and Air Conditioning) units, 1 No. DNO (Distribution Network Operator) sub-station and interface kiosk, 1 No. spares container, access track from access road serving Athy Business Campus and Athy Industrial Estate, CCTV and lighting, perimeter screening earth berm, closed board and wire mesh fencing and ecologically beneficial landscaping, underground surface water storage tank, temporary construction compound, and associated ancillary site development works and services / 0.7 km away / 21 November 2018Granted
- 201555To retain the formation and laying of an internal roadway, weighbridge with ramps and hard surface area. Full planning permission to construct a Grain intake, drying and storage facility, to include dryers, storage shed, storage bins, weighbridges, internal road structure, upgrade existing entrance and associated site works, / 0.8 km away / 10 May 2021Granted
- 2560937For a 70 sq.m side extension to Industrial Unit 10 to form an Electric Vehicle Service Centre, ancillary alterations to front & side elevations, surface water to soakaways and all associated site works / 0.8 km away / 10 October 2025Granted
- 191168A 42m multi-user lattice telecommunications support structure carrying antenna and dishes enclosed within a 2.4 metre high palisade fence compound together with associated ground equipment cabinets, a new access track and, associated site works / 0.9 km away / 30 March 2020Granted
- 181204The amalgamation of Units 2 and 11, and associated internal alterations / 0.9 km away / 23 November 2018Granted
- 231017To construct a storage shed at our grain intake facility (PL Ref 20/1555) and associated site works. Revised by Significant Further Information which consists of; retention to amendments to permitted development (20/1555) to include; (a) Extension of Site Boundaries to include adjoining buildings. (b) Layout of Roadway & Operation of the facility as constructed. (c) 3 no Additional Grain Storage Bins. (d) Control Room / Dust Room. (e) Weighbridge Locations & Hut. (f) Water Storage Tank. (g) Generator Storage Room. / 0.9 km away / 14 October 2024Granted