No.2 'Cluain Lara', Two Mile House, Co.Kildare
Planning application 21205
DecisionConditional grant
Decided13 April 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near No.2 'Cluain Lara', Two Mile House, Co.Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21247The construction of a single storey porch extension to the front of the existing detached dormer dwelling. Retention permission is sought for the conservatory to the side of the dwelling / 0.1 km away / 15 April 2021Granted
- 21456The decommissioning of a septic tank and the installation of a new wastewater treatment system including all associated site development works at / 0.1 km away / 31 May 2021Granted
- 2561273Of amendments to planning permission 19/1100 as follows: (a) As constructed attic for domestic storage area at 1st floor level to existing house (b) As constructed single storey front extension porch to existing house (c) Window at rear elevation at 1st floor level to existing house (d) As constructed side extension to existing house and all associated site development works / 0.1 km away / 13 January 2026Granted
- 19620The demolition of existing single storey rear extension, permission for the construction of a one and a half storey rear extension with single storey element to existing semi-detached bungalow and permission to install a new front door to internalise the existing open porch of existing house, permission for a new dormer window to rear roof plane and all associated site works / 0.1 km away / 28 August 2019Granted
- 191100The demolition of single storey side and rear extension, demolition of front porch, construction of replacement front porch, single storey side and rear extension and all associated site works / 0.1 km away / 17 February 2020Granted
- 18788The construction of a detached two storey house, secondary effluent treatment system, recessed entrance and all associated site works / 0.2 km away / 19 December 2018Granted
- 18258Single storey detached garage to the side of existing house. The works will include minor modifications to the previously approved planning application reg ref. 16/359 for works to the main dwelling, together with associated site works / 0.2 km away / 29 May 2018Granted
- 20231Phase 1 Development: permission for the construction of a community building consisting of a mixed-use community hall (with double height element), permission for a single storey element (front door, toilets and plant room), connecting glass atrium to existing school, removal of approx. 1100 cubic metres of soil (and consequent reduction of site levels to be consistent with existing ground levels around the school), connection to existing secondary effluent treatment system on site and all associated site works. Phase 2 Development: Permission for the construction of a single storey community building consisting to adjoin Phase 1 Development consisting of meeting rooms, kitchen, sport equipment storage rooms, offices, reception and ancillary rooms, connection to existing secondary effluent treatment system on site and all associated site works / 0.2 km away / 19 October 2020Granted