Richardstown, Clane, Co. Kildare.
Planning application 22197
DecisionConditional grant
Decided19 April 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Richardstown, Clane, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2560204For an attic conversion with 2 additional habitable bedrooms, roof windows to both sides of roof. 2 no. gable windows to both front and rear of existing house. Removal of chimney, Solar panels to side roof all with associated ancillary works / 0.2 km away / 16 October 2025Granted
- 1855Proposed separate structure from the main dwelling which will incorporate a garden room of 52sqm, a green house of 21sqm, and all associated site development works to include an external deck / 0.8 km away / 15 March 2018Granted
- 181025An extension to existing garage to incorporate additional area of 14.4sqm at ground floor level. The proposal also includes for conversion of the attic with replacement of existing traditional pitched roof to barrel roof to provide a study of 41sqm with external terrace of 6sqm and all associated site development works / 0.8 km away / 13 December 2018Granted
- 2360340For the construction of a dwelling, a domestic shed, an onsite waste water treatment system, a new road entrance and ancillary works / 0.8 km away / 11 December 2023Granted
- 2460778For the construction of a dwelling, a domestic shed, an onsite wastewater treatment system, a new road entrance and ancillary works. Revised by Significant Further Information which consists of a change of house type and correction of an adjacent boundary and road entrance / 0.8 km away / 09 April 2025Granted
- 22318Retention permission and full planning permission for a development at Castlebrowne, Clane, Co. Kildare. The Development consists of retaining an attic conversion to form a dormer bungalow to include roof windows to the rear & side, constructing a single storey extension to the rear, and all associated ancillary site-works / 0.8 km away / 13 May 2022Granted
- 2660004Consist of an alteration to the position of- (1), the dwelling, (2), the septic tank and percolation area, and (3) the proposed road entrance; all from that previously granted under registry reference 23/60340, with the altered entrance moving from the Western to the Eastern side of the site. / 0.9 km away / 24 February 2026Granted
- 2360433A town park along with a new vehicular access off the R403 via a new roundabout junction, provision of a new traffic calming gateway along the R403 and a new 3m public footpath/cycle lane and lighting along the R403 to connect into the existing public footpath network in the town. The park will consist of: Footpaths/cycle lanes, Soft and hard landscaping, including new woodland planting and grass amphitheater, 3 no. constructed wetlands (including viewing platforms), Car and cycle parking, with new access road to same and pedestrian bridge access to the park, All associated site works including relocation of spoil material from the creation of the constructed wetlands onto agricultural lands at lands / 0.9 km away / 27 November 2024Granted