Oldcourt, Carbury, Co. Kildare
Planning application 23585
DecisionConditional grant
Decided18 July 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Oldcourt, Carbury, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20658(a) The retention of foundations and floor slab of garage for domestic use; (b) The completion of garage for domestic use; (c) And all associated site works / 0.1 km away / 18 August 2020Granted
- 21153(a) Restoration of the derelict traditional vernacular cottage to habitable accommodation in keeping with its original character; (b) Single storey extension to rear (east) elevation of existing vernacular cottage, with rooflights and dormer type window forming light well to central area of house; (c) Garage/fuel store for domestic use; (d) The installation of proprietary wastewater treatment plant with percolation area; (e) Closing up of existing agricultural entrance and proposed replacement combined vehicular recessed entrance and all associated site works; (f) Erection of agricultural hay and farm machinery storage shed and associated access driveway / 0.2 km away / 09 June 2021Granted
- 17799Permission for a period of 10 years to construct and complete a Solar PV Energy development with a total site area of 8.60 hectares, to include a single storey electrical substation building, electrical transformer and inverter station modules, spare parts container, solar PV panels ground mounted on support structures, internal access tracks, security fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works including vehicular access works / 0.6 km away / 28 November 2017Granted
- 201147(a) New single storey extension to the side of the existing house (b) Installation of a new waste water treatment system and all associated site development works, / 0.7 km away / 24 November 2020Granted
- 211457The construction of a domestic garage and all associated site works / 0.8 km away / 09 March 2022Granted
- 22327For development at this site on lands at Oldcourt (Carbury By), Kishawanny Upper, Coolavacoose, Coolcor, Carbury, Co. Kildare. (A Natura Impact Statement has been prepared in respect of this application) The development will consist of planning permission for a period of 10 years to construct and complete a Solar PV Energy Development with a total site area of 121.55 hectares and an export capacity of 100MW, to include: Inverter/Transformer Substations, modules, 2,697 solar arrays ground mounted on support structures, temporary construction compounds, internal access tracks, security fencing, electrical cabling and ducting CCTV and other ancillary infrastructure, drainage, additional landscaping and habitat enhancement as required and associated site development works relating to the access of the site. The solar farm will be operational for 35-years. Oldcourt House protected structure (B08-14), lies outside the developable area but inside the overall boundary. Natura Impact Statement has been prepared in respect of this application / 0.9 km away / 21 September 2022Granted
- 2560076For (A) erection of a one and a half-storey type extension to the rear (South) of the existing single-storey type house, (B) the installation of a new proprietary waste water treatment system and coconut filter percolation area and all associated siteworks. (C) External door to the side (east) of the existing house to be replaced by a window and minor internal alterations to the existing single storey house. Revised by Significant Further Information which consists of: The proposed domestic extension has been changed from one and a half storey to single storey / 0.9 km away / 20 August 2025Granted
- 2560263For the construction of a detached two storey house, single storey domestic garage, secondary effluent treatment system, permission to amend existing family residential entrance to allow access to the site and all associated site works / 0.9 km away / 23 July 2025Granted