Clogheen, Monasterevin, Co. KIldare
Planning application 2360046
DecisionRefused
Decided08 September 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Clogheen, Monasterevin, Co. KIldare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21845 No. wind turbines with a tip height of up to 169m and all associated foundations and hardstanding areas; 1 no. on-site electrical substation; 1 no. temporary construction compound; all associated underground electrical and communications cabling connecting the turbines to the proposed on-site electrical substation; provision of new site access tracks and associated drainage; erection of 1 no. permanent meteorological mast of up to 100m in height; and all associated site development works, ancillary works and equipment. Permission is sought for a period of 10 years and an operational life of 30 years from the date of commissioning of the entire wind farm. A concurrent planning application is being submitted to Offaly County Council in relation to the elements of the proposed development that are within County Offaly, which consist of road/junction accommodation works to facilitate the turbine deliveries associated with the proposed wind farm development in Co. Kildare. An Environmental Impact Assessment Report (EIAR) and a Natura Impact Statement (NIS) have been prepared in respect of the proposed development. All within the townlands / 1.3 km away / 18 March 2021Refused
- 20225Construction of a dormer bungalow type dwelling, detached garage, effluent treatment system and percolation area, recessed vehicular entrance and all associated site works / 1.7 km away / 11 June 2020Refused
- 181099Bungalow type dwelling with effluent treatment system and percolation area with new vehicular entrance and all associated site works / 1.7 km away / 01 November 2018Refused
- 181237Extension of Duration of planning Ref. No. 06/2729 - continued use of an existing stone quarry at a site of 9.82ha in the townland / 2.7 km away / 04 December 2018Refused
- 221014The construction of a detached single storey dwelling, foul water to on site effluent treatment system and percolation area, surface water to soakaways, recessed vehicular entrance via an existing entrance and all associated site works / 2.9 km away / 10 October 2022Refused
- 2460347For a Storey & Half Type Dwelling & Domestic Garage with Effluent Treatment System & Percolation Area, Vehicular Entrance and all associated site works / 3.0 km away / 07 June 2024Refused
- 2255THE CONSTRUCTION OF A DETACHED BUNGALOW, RECESSED ENTRANCE, SECONDARY EFFLUENT TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS / 3.0 km away / 08 July 2022Refused
- 19298To erect four-bedroom detached single storey dwelling, domestic garage, packaged wastewater treatment system and polishing filter and all other associated site development works / 3.0 km away / 16 May 2019Refused