GrantedDecided 07 September 2023Kildare County Council

Kildare Innovation Campus (KIC), Barnhall Meadows, Leixlip

Planning application 2360047
DecisionConditional grant
Decided07 September 2023
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Kildare County Council.
Will consist of Demolition of existing Buildings No’s 7, 8 and 9 (total gfa c. 84,838sqm). - Existing Buildings No’s 1 – 6 will be retained for deep tech and innovation related uses (total gfa c.42,862sqm) - Construction of 2 no. new deep tech buildings and 4 no. new data centre buildings, all including ancillary office spaces. The deep tech buildings will have an overall maximum height of c.16m and vary in size from30,945sqm – 41,190sqm with a combined total gfa of c. 72,135 sqm. The data centres will be c.15 m in height to parapet and c.16.5m in height to top of roof plant screening. The data centres will vary in size from 13,225 sqm – 21,000 sqm with a combined total gfa of c. 76,225sqm. All buildings will be provided with Solar PV panels at roof level and green walls along selected elevations. - The new deep tech buildings (A1 & A2) will be provided with service yard areas, loading docks, car parking, access roads, security fencing/gates and landscaping. The deep tech buildings will include rainwater harvesting tanks and green roofs over office areas. - Each data centre (B1, C1, C2 & C3) will include data halls, admin blocks (comprising offices, breakroom, loading dock, storage, and ancillary areas) and a variety of mechanical and electrical plant areas/structures including battery storage rooms and mechanical rooms. Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided. - B1 will include 14 no. fuel oil generators, MV rooms and associated mechanical flues. C1 – C3 will each include 22 no. fuel oil generators, MV rooms and associated mechanical flues (each c.18.6m high). Car parking, access roads, security fencing/gates, gate houses and landscaping will also be provided. - 2 no. district heating pump house areas and inground piping for district heating system. - Construction of a Replacement 110kV Gas Insulated Switchgear (GIS) Substation adjacent to the existing 110kV Rinawade Substation. The current Air Insulated Switchgear (AIS) substation known as the Rinawade 110kV sub is fed by 2 x 110kV Overhead lines. The new substation will connect to these overhead lines via short runs of underground cable. The replacement 110kV substation will include 6 No. transformers, with client control building and a 2 storey GIS substation building within a 2.4m high fenced compound. - Decommissioning and removal of the existing 110kV Rinawade substation. - Construction of an on-site energy centre to provide to the nation

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Kildare has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near Kildare Innovation Campus (KIC), Barnhall Meadows, Leixlip?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →