Ballycowan, Carbury, Co. Kildare.
Planning application 2360154
DecisionConditional grant
Decided23 October 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballycowan, Carbury, Co. Kildare.?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 221811. Proposed Construction of New Traditional Style Dormer Bungalow Dwelling, with Four Bedrooms, and Domestic Storage Garage with Solar panels. 2. Effluent treatment system and all associated ancillary site works for percolation area. 3. Cattle shed including slatted tank, along with concrete yards and all ancillary works. 4. Recess existing entrance, replace existing gate with traditional style new gates and all associated site works / 0.6 km away / 28 July 2022Granted
- 23602661. Quarry development and associated processing previously permitted under P. Reg. Ref. No. 99/2042 and ABP Ref. PL09.123207) to include drilling, blasting, crushing and screening of rock; and lateral extension to same, with an overall extraction area of c. 6.2 hectares with no vertical deepening below the existing quarry floor. The appropriate period of planning register reference 99/2042 was extended by order dated 03/02/2017 by P. Reg. Ref. No. 16/1246; 2. Importation of up to 35,000 tonnes per annum of processed fine aggregate, principally sand for use in readymix concrete production on site; 3. Use of buildings and structures associated with the sand and gravel pit previously granted planning permission under P. Reg. Ref. No. 03/2754 comprising of the crushing, washing and screening plant with associated silt disposal lagoons; readymix concrete batching plant including powerhouse; prefabricated office; weighbridge; workshop building with concrete laboratory and bunded fuel tanks; aggregate storage bays; and one liquid effluent treatment system unit; 4. Closure of the existing site entrance with provision of a new site entrance located to the north of the existing entrance; realignment of the main internal site access road from the new site entrance to the central processing area with provision of a new wheelwash system; acoustic fence screening (c.2m in height x 170m in length); and a new screening berm along the western site boundary; 5. Restoration of the site lands will be to a combination of beneficial agricultural and ecological after-uses; 6. All associated site works within an overall application area of c. 51.7 hectares. The proposed operational period is for 10 years plus 2 years to complete restoration (total duration sought 12 years); and 7. Provision is also made for 3 no. sections of road improvements (widening) along the haul route between the site entrance and the R148 regional road. The proposals at the identified locations include for works in the public road and verge that aim to achieve a consistent carriageway width of 6.0m along with provision of verge widening on the inside of the three bends to improve forward visibility and intervisibility for all opposed traffic including traffic generated by the proposed development. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this planning application / 0.7 km away / 13 February 2024Granted
- 2660420Alterations carried out during the course of construction, including the revised position of the house and garage and percolation area/septic tank on site, an increased ridge height, an expansion of floor area, and amendments to the internal layout. All other details, such as entrance, sightlines, wastewater treatment system, driveway, domestic shed design and cattle sheds as per original application 22/0181 / 1.0 km away / 10 June 2026Granted
- 201409Development within an overall application area of 17 hectares. Upgrading of the site entrance onto the R401 regional road, consisting of improvements to the surface to allow regular HGV traffic. Installation of all required site facilities, consisting of a prefabricated welfare facility (including a toilet facility with septic tank and percolation area), a double skinned fuel tank in a secure container, a weighbridge and a wheelwash. Installation of a processing plant and associated settlement lagoon (closed water system). Extraction of sand and gravel with processing that includes crushing, washing and screening, using the newly installed plant over an area of 9.2 hectares. The extraction works will take place in two phases (Extraction Phase 1: c. 4.9 hectares and Extraction Phase 2: c. 4.3 hectares). The sand and gravel extraction will be dry working above the water table. The remaining c. 7.8 hectares will consist of the processing area, a stockpile area, and overburden storage area and buffer zones to the site boundaries. Restoration of the site lands will be to a beneficial agricultural after-use. The proposed operational period is for 8 years plus 1 year to complete restoration (total duration sought 9 years). An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application. Revised by Significant Further Information which consists of updates to the EIAR and revised plans which include amendments to the proposed sand and gravel extraction depths within Phase 1 and Phase 2 / 1.1 km away / 21 September 2021Granted
- 2280(A) retention permission of existing partially constructed ground floor section of a two-storey house (B) completion of two-storey house (C) the installation of a proprietary wastewater treatment plant with a soil polishing filter percolation area (D) erection of a storey and a half type stable building consisting of 7 no. horse boxes, tack room, feed store, staff toilets with semen laboratory and store with first floor office space, staff canteen and feed store loft area with covered dungstead and effluent holding tank to the rear (east elevation) and all associated site works. Significant Further Information/revised plans submitted on this application. / 1.1 km away / 15 September 2022Granted
- 181107A new single storey extension to the side of my existing home, associated site works and services / 1.7 km away / 09 May 2019Granted
- 19814For partial demolition of rear single storey extension, construction of a ground floor extension to side and rear and first floor extension to rear. Revised by significant further information consisting of; Retention planning permission is now being sought for installation of wastewater treatment system to rear / 1.8 km away / 31 July 2020Granted
- 181444(a) Demolition of existing lean-to extension to rear of existing house and demolition of existing galvanized roofed outbuilding, (b) single storey extension to rear (east elevation) of existing house, (c) minor internal alterations within the existing house, (d) installation of Oakstown BAF waste water treatment system with soil polishing filter percolation area, (e) erection of new garage /fuel store for domestic use and (f) upgrading of existing entrance to a vehicular recessed entrance and all associated site works. / 1.8 km away / 29 January 2019Granted