Oldmilltown, Kill, Co. Kildare
Planning application 2360356
DecisionConditional grant
Decided04 July 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Oldmilltown, Kill, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460226Of a single-storey extension to the side of the existing single-storey dwelling and planning permission for (a) decommissioning of existing septic tank and soakpit, (b) installation of new treatment system and percolation area along with all associated site development and facilitating works / 0.3 km away / 20 August 2024Granted
- 17635For the construction of a single storey flat roof extension to the rear of the existing dwelling, minor alterations to the elevations of the existing dwelling, and installation of Tricel sewage treatment system with percolation area, along with all associated site works / 0.4 km away / 04 October 2017Granted
- 221202For the development of an extension of the existing control building at ESB Kilteel 110kV and all associated ancillary infrastructure required for the project / 0.5 km away / 24 November 2022Granted
- 20745The development of a new electrical substation and additional equipment in the existing ESB Kilteel 110kV Substation to facilitate the connection of the Porterstown Battery Storage Facility (Planning Ref 18/247) The total site area is 1.2 hectares. The new electrical substation will include 1 control building (GRP Containerised Substation), a 110kV transformer, surge arresters, instrument transformers, a 110kV busbar connecting to the ESB substation, a lightning mast and other electrical equipment to be installed on concrete support structures. Additional features will include palisade fencing, security gates, access tracks, external lighting, drainage, associated electrical cabling and ducting, CCTV security monitoring system, landscaping and all associated ancillary infrastructure. The additional equipment to be installed in the ESB substation to facilitate the connection of the new substation will include a 110kV busbar extension, a 110kV transformer bay, a 110kV coupler bay, a 110kV busbar connecting to the new substation, an interface kiosk, palisade fencing, a lightning mast and all associated ancillary infrastructure required for the connection / 0.5 km away / 01 September 2020Granted
- 25120To install a standby industrial diesel generator under proposed solar panels. The generator, to provide standby power generation, will incorporate a bunded fuel tank and be located within a mesh fence. The proposed solar panels will be attached to a steel frame to be erected over the generator (covering an area of approximately 22 sq.m., to a maximum height of 4.7 metres above ground level). Works to include all ancillary development works, all located within an existing fenced compound / 0.5 km away / 25 August 2025Granted
- 22137To erect 709.89 m2 or 131 kWp of photovoltaic panels on the roof of our existing building at Oman Moving & Storage, with all associated site works / 0.6 km away / 04 April 2022Granted
- 23276For a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at / 0.6 km away / 11 May 2023Granted
- 19427(i) the construction of a single storey 54m2 sales office, and all associated ancillary site development works; (ii) retention of an existing sealed septic tank to be used in association with the proposed sales office / 0.6 km away / 19 July 2019Granted