Naas Shopping Centre, Naas, Co. Kildare
Planning application 23839
DecisionConditional grant
Decided05 December 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Naas Shopping Centre, Naas, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360071The two-storey extension to the rear of the house. / 0.1 km away / 20 September 2023Granted
- 21397The installation of glazing as previously permitted under Reg. Ref. 04/500037 (An Bord Pleanála Ref. PL 73.213031) enclosing the stair lobby to the south east corner of the existing building / 0.1 km away / 17 May 2021Granted
- 23579Demolition of temporary access to Bank of Ireland in former part of Bank of Ireland structure, including ramp and rail and removal of ATM machine. Modification of former Bank of Ireland structure to create new openings to a new plaza at the rear, including security gates and 2 no. signs (front and rear). Provision of new public house internal layout for The Forge Inn over 4 no. floors including basement, along with minor works to north facade and provision of new 3 storey lift lobby extension. Provision of retail use in existing vacant unit to the rear of The Forge Inn including new glazing. Provision of new plaza including hard and soft landscaping, seating and lighting. Erection of 2 no. ATM machines on south facade of Bank of Ireland building and provision of new entrance doors and 3 no. signs. All associated site works including drainage, vacant retail unit to rear of the Forge Inn and vacant land to the rear of the former Bank of Ireland / 0.1 km away / 19 July 2023Granted
- 2560845For alterations to permission previously granted under Pl. Ref 23 579 in the structure to the rear of The Forge Inn, (Protected Structure RPS. Ref. NS19-186). The proposed alterations include 1) 8 no. bedroom suites on the first & second floors to the rear of The Forge Inn, which was previously permitted as a public bar & staff areas, the bedroom accommodation will be used ancillary to the Forge Bar to form a Boutique Hotel 2) and all associated site works / 0.1 km away / 10 March 2026Granted
- 2660026A mobile coffee and snack food trailer / 0.1 km away / 09 March 2026Granted
- 2460343For change of use of a terraced two storey over ground-floor, a Protected Structure from Bank use to 4 No 1 bed apartments on first and second floors with internal and external alterations, new balconies to apartments No 1 and 3, alterations to ground-floor stairs area for plant, cycle storage and external bin storage to rear, deletion of external metal stairs, communal area to rear / 0.1 km away / 07 June 2024Granted
- 2660028Signage on the front entrance of the Naas Plaza (Former Bank of Ireland Building (Protected Structure RPS Ref. NS19-034)) / 0.1 km away / 09 March 2026Granted
- 2660250For internal works to a Protected Structure NS19-006. Works consists of; reordering of internal furniture layout involving removal of existing timber pews and replacement with loose chairs. Removal of existing raised pulpit area and enclosure, and replacement of missing timber floorboarding following its removal. The salvaging of surrounding panels to form bench storage area and wall paneling. The construction of a fixed screened area for audio equipment area to rear / 0.1 km away / 01 May 2026Granted