Tyrellstown, Athy, Co. Kildare
Planning application 2460275
DecisionConditional grant
Decided23 May 2024
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Tyrellstown, Athy, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 23845Upgrading of existing wastewater treatment system and for retention of existing pitched roof / 0.1 km away / 04 October 2023Granted
- 23543The construction of a single storey extension to the south east elevation of my existing dwelling, alterations to existing entrance and all associated site works / 0.3 km away / 01 February 2024Granted
- 20906Demolition of existing garden shed, decommissioning of existing well, development of a new two storey dwelling house, connections to mains sewer and mains water supply, a new entrance and all associated site development works. Revised by Significant Further Information which consists of revised plans to a dormer style dwelling house, additional data to include a proposed on site wastewater treatment system and local need further information / 0.8 km away / 18 May 2021Granted
- 1931Sought for sun room to rear, bay window to side, conversion of attic to study/playroom and Permission is sought for 3 No. dormer windows and detached garage/home gym / 0.9 km away / 12 March 2019Granted
- 18428Demolition of existing extension, construction of new dormer-style extension to existing dwelling, upgrading of existing effluent treatment system, upgrading of existing entrance and associated site works / 1.3 km away / 06 December 2018Granted
- 171108Retention of a single storey extension to side and rear of existing single storey semi-detached cottage / 1.3 km away / 30 November 2017Granted
- 17343The construction of a detached two storey dwelling; the construction of an associated garage; the provision of a new vehicular entrance (including associated works to achieve sightlines, gates, piers and railings) and driveway; the provision of landscaping, including boundary treatment; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including waste water treatment system and percolation area / 1.5 km away / 09 August 2017Granted
- 19336To amend the design of the approved development (Planning Reference 16/1007). Permission is also sought to amend the lifespan of the consented development from 27 years to 35 years. The development will consist of ground mounted solar panel photovoltaic (PV) farm to generate renewable electricity on a 12.02ha site, comprising solar arrays, associated electrical infrastructure, fencing, access improvements and ecologically beneficial landscape works at Moatstown Development Site, Milltown, Athy, Co. Kildare, ITM Grid Reference 665656, 696962, subject to 17 conditions. Amendments proposed are: No changes to red line boundary and no changes to perimeter fence or CCTV points; The height of the solar panels has been increased slightly from 2.3m to 2.5m, their angle span amended from 20-30 degrees to 10-40 degrees. Panels layout has been slightly reconfigured to account for the changes in the height. A slight increase in the overall land take from solar panels; Changes in land take for new access tracks from 3,500sqm to 1,890sqm; Temporary compound area to be moved 60m southwest, but will retain its overall size of 2,800sqm with slight alteration to its overall shape. Compound will be reinstated at the end of the construction phase; Energy Storage Area will be enlarged from 750sqm to 1,265sqm, an increase of 515sqm; Changes from four substations/energy storage containers and one grid connection point to two substations with larger areas of hardstanding and a grid connection point. The land take from the proposed changes is expected to change from 774sqm to 940sqm, an increase of 166sqm; overall decrease in ground disturbance/land take is expected to be approximately 929sqm. / 1.6 km away / 23 May 2019Granted