Woodside, Melitta Road, Kildare
Planning application 2460349
DecisionConditional grant
Decided17 June 2024
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Woodside, Melitta Road, Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2461266For warehouse (wholesale) unit as constructed, (alterations to plans approved under Planning Reference Number: 22/1322). The alterations include change of roof height and design from double portal frame to single portal frame and minor alterations to elevations and all associated site works / 0.1 km away / 28 January 2025Granted
- 221322To construct a commercial/retail unit with entrance off existing business park, new boundary fence, concrete hardstanding area, connection to existing services and all associated site works. Revised by significant further information which consists of 1) landscape plan, 2) revised drainage design & reports, 3) revised parking & cycle layout with disabled parking & footpath connection to existing footpath, 4) traffic & transport assessment with sweep path analysis and 5) noise study for proposed site / 0.1 km away / 15 May 2023Granted
- 17485(1) Part demolition of existing out-building; (2) Construction of new two storey extension to rear of existing dwelling, comprising kitchen/living area to ground floor and en-suite bedroom to first floor; (3) Domestic shed for storage purposes and (4) All associated site works / 0.1 km away / 22 June 2017Granted
- 191427The demolition of the existing building and the construction of 4 No. two storey (2 bedroom) terraced dwellings with vehicular access off Melitta Road, 4 No. vehicular parking spaces, screened external refuse storage area and all associated site works / 0.2 km away / 19 October 2020Granted
- 2360321For the phased construction of a new 2 storey, 37 classroom post primary school (Curragh Community College) with a total floor area of circa 10,883.8sqm along with ancillary accommodation including an external bin store, electricity substation, external caretakers office, storage shed, heat pump enclosure, car parking, drop off, bicycle parking, grass playing pitch (to be shared with adjoining Kildare Town Educate Together and Gaelscoil Mhic Aodha), external ballcourts, including adjusted/ additional ballcourts in the grounds of Kildare Town Educate Together and Gaelscoil Mhic Aodha, Photovoltaic panels on roof, circa 135m length of access road from Melitta Rd, a service road connection off the existing access road to the south east of the site and all ancillary site development works. Phase 1 will include the construction of c.4,982sqm of (2 storey) school accommodation incorporating photovoltaic panels on roof, 16 classrooms, specialist classrooms, sports changing rooms, fitness suite, temporary staffroom and GP Hall / dining space (to be converted to specialist classrooms in Phase 2), along with ancillary accommodation including an external bin store, electricity substation, external caretaker office, storage shed, bicycle parking and 2 No. ballcourts and heat pumps. Phase 1 also includes a temporary permission for an interim school entrance on the south façade, temporary drop off and car parking area, a temporary school vehicular and pedestrian access off the existing access road to the south east and all associated site development works. Phase 2 will include the completion of c.5901.8 sqm of (2 storey) school accommodation incorporating 21 classrooms, specialist classrooms, a general purpose hall, a PE hall, a special needs unit, library, staff room and all ancillary accommodation. Phase 2 also includes 92 No car parking spaces, additional bicycle parking, an SEN garden, a drop off, a grass pitch area, 3 additional ballcourts plus hard and soft landscaping to replace the temporary (Phase 1) drop off and car parking to the south, adjustment of existing ballcourts and 2 additional ballcourts for Kildare Town Educate Together, adjustment to existing car parking and 1 additional ballcourt for Gaelscoil Mhic Aodha, a service access off the existing access road to the south east along with circa 135m length of access road from Melitta Rd and all ancillary site development works. Revised by Significant Further Information which consists of: Alteration / 0.2 km away / 09 October 2024Granted
- 2460214For a detached single storey preschool building to the rear of the existing Gaelscoil, surface water to soakaways, foul water to existing foul sewer and all associated site works. This development is to replace the previously granted preschool, permitted under Pl. Ref. 211587. / 0.2 km away / 12 July 2024Granted
- 19388(a)temporary installation of 2 no. prefabricated modular type buildings for use as a pre-school and afterschool club for a period not exceeding 2 years. The subject buildings are to be installed and used as a temporary replacement for 2 no. existing classrooms, located within the school building, currently in use as a pre-school and after school club, (b) ramps/landscaping, (c) connection to existing mains services on-site and all associated site development works / 0.2 km away / 30 May 2019Granted
- 201448(a) 5 year extension to retain 2 no. prefabricated modular type buildings for use as a pre-school and after school club, ramps, landscaping and connection to mains services on site. Permission was previously granted on 15/07/2019 under Planning Register Reference No. 19/388 for the temporary installation of said 2 no. prefabricated modular type buildings for use as a pre-school and after school club for a period not exceeding 2 years. The subject buildings along with all ancillary development are proposed to be used as a temporary replacement for 2 no. existing classrooms, located within the school building. All works as described above are located within the grounds of / 0.2 km away / 27 January 2021Granted