The Former Donnelly Mirrors Site, Maudlins, Naas
Planning application 2461154
DecisionConditional grant
Decided12 September 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near The Former Donnelly Mirrors Site, Maudlins, Naas?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 17988The erection of a new 540sqm single storey warehouse building and associated site works. Site boundary fence to be partially removed as proposed building to be constructed on the boundary line / 0.2 km away / 15 December 2017Granted
- 211102Proposed vehicle entrance to the rear of Irish Dog Foods on the North eastern boundary Which shall comprise of 2.4m high 4m wide motorized galvanized gate and all ancillary works / 0.2 km away / 30 November 2021Granted
- 221522The development will consist of: (a) Demolition of Industrial Unit Nos. 17, 18 and 19 (550 sqm); (b) Construction of Industrial building extension (1954 sqm) to Production building for increased Manufacturing area and additional Loading Bays. This building will comprise Processing Area, Ovens, 3 No. Loading Bays all on ground floor, and on first floor (735 sqm) comprise offices, changing areas, canteen, toilet facilities and plant room; (c) Erection of signage on building; (d) And all ancillary works / 0.2 km away / 05 April 2023Granted
- 23586The erection of a new 436.5sqm single storey Warehouse building and associated site works / 0.2 km away / 31 August 2023Granted
- 17605To construct an extension to the existing facility which will consist of the construction of a freezer warehouse, marshalling area and two loading docks together with all ancillary site works. Also it is proposed to extend and revise the layout of the existing carpark, closing the present entrance from the adjacent roadway and constructing a new access to the east of the existing entrance including all associated site works / 0.2 km away / 29 August 2017Granted
- 2460574For demolition of all existing buildings on the site (c.9,949sq.m) and north and north-western boundary wall. Provision of new Electric Vehicle Charging Hub for 36 vehicles (all under canopy measuring 3.22m high) along with 8 no. EV bus/HGV charging spaces. Construction of 8 no. buildings (total gfa 10,527.59sq.m) as follows: Distribution centre: single storey structure including offices (gross floor area 9,383.85sq.m) with a maximum height of 19.5m. It includes 13 no. loading bays, Service station – single storey building (759.5sq.m) including net retail area of 99.7sq.m, 3 no. food offers, seating area, drive-thru hatch, toilets, back of house area and external storage compound. The maximum height is 8.55m high. Drive-thru café – single storey building (256.70 sq.m) including kitchen, back of house, seating area and drive-thru hatch. The maximum height will be 6.24m. Substation (gfa 33.54sq.m). External generator (gfa 37.58sq.m) Service compound (gfa 37.58sq.m) Water pump house (gfa 12sq.m) Refuse compound (gfa 6.84sq.m) There will be signage on the distribution centre, service station and drive-thru café buildings. Free standing signage is also proposed within the site and a totem sign measuring 17.5m high and an information sign measuring 6.8m high at the perimeter of the site. All ancillary development including fuel pumps under canopy (5.6m high), underground tanks, vent pipes, HGV fuel pumps (5.6m high), modified vehicular entrance off Maudlins roundabout, replacement entrance off Johnstown Road with new slip lane, new spine road, car parking (169 – including EV parking and accessible spaces), cycle parking (46) with canopy over (3.1m high), HGV/Bus parking (16 no. – including 8 no. EV parking spaces, HGV only parking 3 no.), drainage infrastructure, boundary treatments, hard and soft landscaping (including detention basins), internal roads, footpaths and cycle lanes, outdoor exercise areas, outdoor eating/picnic areas, covered smoking area, overground tank, roof mounted solar panels, new internal roundabout junction, internal control sliding gate, underground fire water storage tank and lighting. All associate site works. The proposed development also includes works on lands in the ownership of Kildare County Council as part of the Key development Area Master Plan and Access Strategy agreed with Kildare County Council, to include: 1. Provision of a left slip lane from the R445 (Dublin Road) to the Monread Road at the Dublin Road Roundabout / 0.2 km away / 07 March 2025Granted
- 24216To (i) Construct an ESB substation on the South Western Corner if the Site. (ii) Construct a lean-to bin storage area in front of the Southern Side of the Existing Building. (iii) Carry out Internal alterations of the existing Staff Facilities Area at ground floor level. (iv) Construct a new Mezzanine Floor on the Southern End of the Existing Building. (v) Erect new Signage on the Southern (Front) Elevation of the existing Building. (vi) Remove the existing 4No. Circular Tanks on the Northern Side of the Site and install a new rectangular Water Storage Tank. (vii) Construct a new Detached Workshop Shed on the Northern Side of existing building and all associated site works and services / 0.2 km away / 12 September 2024Granted
- 20406Construction of light industrial unit including associated office, training and ancillary accommodation, car parking, yard vehicular entrances, site enclosures, landscaping, ancillary site works and services / 0.3 km away / 15 January 2021Granted