Circle K M9 Kilcullen Service Area, Kilgowan, Kilcullen
Planning application 2560041
DecisionConditional grant
Decided06 March 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Circle K M9 Kilcullen Service Area, Kilgowan, Kilcullen?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2461316For a high-power electric vehicle charging hub and associated infrastructure, consisting of the following: (i) installation of 20no. electric vehicle charging bays and 10no. charging points, (ii) Installation of new canopy with associated illuminated signage (iii) new modular ESB Substation, (iv) associated revisions to existing landscaped area including relocated lighting columns, the provision of new lighting columns, new road markings and pedestrian walk way and, (v) all other associated drainage and site development works / 0.1 km away / 10 February 2025Granted
- 2360402Construction of one modular classroom together with all its associated site works. Revised by Significant Further Information which consists of retention permission for the foundations to the proposed modular building and for the partially constructed canopy walkway. Planning Permission is sought to complete the walkway and install the modular classroom / 0.4 km away / 23 February 2024Granted
- 23990Retention of constructed (a) bay window, (b) sun-room and (c) domestic sheds (4 off) and renovation of same, one of which to be converted to domestic office / 0.8 km away / 08 January 2024Granted
- 18453(i) establishment of an inert soil waste recovery facility to provide for the importation of approximately 1,200,000 tonnes of natural inert waste materials, principally excess soil, stone and / or broken rock to backfill the pit void to former ground level and improve lands currently in agricultural use. The development will be carried out on a phased basis and will be completed within 8 years; (ii) share use, with the existing Kilsaran concrete manufacturing and waste facilities, of existing site and services infrastructure including site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access; (iii) use of section of existing concrete block curing shed as a waste inspection and quarantine facility; and (iv) temporary stockpiling of topsoil pending re-use as cover material for final restoration of the site. The proposed development requires a waste licence from the Environmental Protection Agency. An Environmental Impact Statement (now referred to as an Environmental Impact Assessment Report (EIRA)) will be submitted / 0.8 km away / 26 October 2018Granted
- 2660365Construction of domestic garage and all associated site and development works / 0.9 km away / 29 June 2026Granted
- 171233As constructed house on site and all associated site development works. Significant Further Information: Retention of extension and alterations to existing dwelling and all associated site development works. / 1.0 km away / 13 March 2018Granted
- 2010711. Full planning permission for extension/alterations to the rear of our existing dwelling to include: (a) Demolition of 22sqm single storey extension; (b) Construction of 131.6sqm part single storey part two storey extension to the rear of the dwelling, and (c) Upgrade of existing waste water treatment system. 2. Permission for retention of 105.6 single storey domestic steel shed to the rear of the site together with all associated and ancillary site works / 1.1 km away / 25 January 2021Granted
- 2460265For (i) an increase in the total permitted intake of soil and stone and broken rock to the existing licensed soil recovery facility at Halverstown, Kilcullen, Co. Kildare (Planning Ref: 18/453), from 1.2 million tonnes to 2.06 million tonnes and (ii) an extension to the life of the existing facility of 3 years (to December 2029) in order to accommodate the additional soil and stone intake. These works, which are required to implement a revised backfilling and restoration scheme for the former sand and gravel pit will also provide for (i) continued shared use of existing, co-located site facilities, structures and infrastructure (including the site office, staff welfare facilities, weighbridge (with dedicated office), wheelwash, hardstand areas, fuel storage tanks and site access road); (ii) continued soil and stone intake at a rate of up to 300,000 tonnes per annum, of which no more than 95,000 tonnes (per annum) will be managed as waste; (iii) continued separation of any construction and demolition waste (principally concrete, metal, timber, PVC pipework and plastic) inadvertently imported to the facility, prior to removal off-site to authorised waste disposal or recovery facilities; (iv) continued use of a section of the existing concrete block curing shed as a waste inspection and quarantine facility; (v) continued environmental monitoring of noise, dust and groundwater for the duration of the site recovery and restoration activities and for a short period thereafter (and in accordance with current EPA waste licence requirements); (vi) continued temporary stockpiling of topsoil pending its re-use as cover material for final restoration of the site; and (vii) ultimate restoration of the modified final landform to native woodland and grassland habitats. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of this Planning Application. The proposed development requires a waste licence review from the Environmental Protection Agency / 1.1 km away / 07 November 2024Granted