Newbridge College, Newbridge, Co. Kildare
Planning application 2560127
DecisionConditional grant
Decided09 July 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Newbridge College, Newbridge, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 181571Installation of new gates at the main school vehicle entrance on Sex Road, to match the design of the existing pedestrian entrance gate and adjacent railings, the installation of new weldmesh perimeter fencing and gates on College lands to the southern boundary (behind the existing boundary walls) of the school site between the existing main school site entrance on Sex Road and the school site boundary opposite The Grange housing estate together with all ancillary and associated site works. Newbridge College is listed on the Record of Protected Structures in the Kildare County Development Plan 2017 - 2023. All development / 0.2 km away / 11 June 2019Granted
- 191333A storey-and-a-half house in the side/rear garden of Paul's parent's house, demolition of existing domestic shed, and all associated site works / 0.2 km away / 25 June 2020Granted
- 181568The development will consist of enclosing an existing open courtyard with a single storey roof (part flat and part pitched glazed roof) to the rear of Junior House and adjacent to Albert's Wing in order to create an internal open plan social and recreation area, the enclosing of an existing floor walkway to the rear of Junior House and on the eastern side of Albert's Wing, the construction of a single storey flat roof lobby to the western side of Alberts's Wing and south of the Refectory together with all associated accommodation and all associated siteworks. Newbridge College is listed on the Record of Protected Structures in the Kildare County Development Plan 2017-2023 / 0.2 km away / 20 February 2019Granted
- 21225Single storey extension to the rear of my house. The development will consist of a bedroom extension, a kitchen/living room extension, and minor alterations to the boundary walls at the front of the house, and all associated site works / 0.3 km away / 24 May 2021Granted
- 22968(1)The phased demolition of existing school buildings, with the exception of the existing dining hall (884.8m2), which is to be retained, (2) to allow the school to remain operational during the construction period, the retention and relocation of the existing temporary school accommodation units and, on completion of construction works, the decommissioning and removal of all temporary school classrooms, (3) the phased construction of a new 3-storey school building with a total gross internal floor area of 9,731.3m2 incorporating 37no. general classrooms, a series of support and specialist classrooms, a special needs unit, a library, multi media rooms, staff rooms and all ancillary accommodation including photovoltaic panels at roof level and separate external storage sheds (190m2) and refuse store (45m2), (4) the construction of a single storey multi-use sports hall (1,107m2), (5) the new school grounds will comprise the construction of 4no. multiuse hard ball courts, outdoor seating and breakout areas, a sensory garden, a tech yard/engineering courtyard, riverside social courts and associated hard and soft landscaping along with the retention of the riverside buffer, (6) the retention of existing vehicular and pedestrian access arrangements from the Naas Road with modifications to the internal roadway and the provision of 85no. car parking spaces (including 4no. disabled parking spaces and 2no. EV charge point spaces) and 170no. bicycle parking stands providing 340no. parking spaces, (7) the proposal also includes new foul and surface water drainage system works incorporating SUDs measures, attenuation, rainwater harvesting, a new substation (28m2), Liquid Petroleum Gas (LPG) and Air Source Heat Pump (ASHP) compounds and all other associated site and development works / 0.3 km away / 20 January 2023Granted
- 17767The construction of a new temporary single storey prefabricated building containing 1 no. technology classroom and 1 no. preparation room to be located to the rear / north of the existing main school building and adjacent to the playing fields together with all other ancillary and associated siteworks / 0.3 km away / 23 August 2017Granted
- 21281For the demolition of the existing single storey cottage and the construction of a single storey replacement dwelling and a single storey detached garage together with all associated site development and site service works for this development adjacent to Riverside Park, Roseberry Commons, Newbridge, Co. Kildare. Access to the proposed dwelling will be via the existing cul de sac road off the Barrettstown Road leading through both the existing College Grove and Riverside Park Housing Estates and though the existing gateway on the applicant site boundary at the end of Riverside Park, Roseberry Commons, Newbridge. Planning Permission was previously granted for the same development under Kildare County Council planning reference 10/801 and the same permission was granted an extension of duration of planning permission under planning reference 15/898. Development is adjacent to / 0.3 km away / 12 November 2021Granted
- 2460412For phase 1 of a 2 phase residential development for some 126 no dwellings on a wider site are of c4ha. The phase 1 will consist of A) The construction of 40 no. residential dwellings and a creche comprising: 32 no. houses (26 no. 3 bedroom dwellings [2 storey] and 6 no. 4 bedroom houses [3 storey]) and 8 no. apartments/duplex apartments comprising 1 no. 2 bedroom apartment and 1 no. 3 bedroom duplex apartment in a separate end of terrace (3 storey) arrangement in 4 locations throughout the site (with apartments/duplex units to include balcony or terrace/private amenity space); B) Vehicular/pedestrian and cyclist access from the Naas Road along with upgrades to the existing vehicular, pedestrian, cyclist and public transport infrastructure along the Naas Road including; the installation of new segregated cycle lanes either side of the Naas Road; a relocated bus stop location at the northern section of the Naas Road and upgraded bus stop at the southern section; a toucan pedestrian crossing across the Naas Road, revised carriageway, and enhanced pedestrian pathways; C) The provision of 62 no. surface resident car parking spaces (including visitor and creche) as well as bicycle storage for apartments; internal road and shared surface networks including pedestrian and cycle paths; D) A 2 storey creche of c. 222 sq. m (with associated play area and parking); E) Provision of c. 0.57 ha of public open space including proposed central square, as well as linear parkways as well as outdoor play areas, and landscaped planting; F) Provision of foul and surface water drainage as well as bin stores; public lighting and all associated landscaping and boundary treatment works, site development and infrastructural works, ESB substations, and all ancillary works necessary to facilitate the development (the proposed development will provide all roads, services [foul & attenuation] and landscaping for the Phase 1 and Phase 2 sites) on this 2.84 ha site / 0.3 km away / 28 November 2024Granted