Cherryville Cottage, Cherryville, Co. Kildare
Planning application 2560203
DecisionConditional grant
Decided25 July 2025
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Cherryville Cottage, Cherryville, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2561349For the erection of a new milking parlour and collecting yard, drafting yard, dairy, plant room, cubicle shed and feeding passage, soiled water tank, slatted slurry tank, demolition of existing dry store, concrete yards and all ancillary works / 0.4 km away / 30 January 2026Granted
- 2460516Of single-story rear extension and one and half story dormer floor extension as constructed to existing detached house and all associated site works / 0.4 km away / 29 January 2025Granted
- 18962The demolition of existing single storey detached domestic garage to accommodate permission for the construction of a dormer style extension to the side of existing dormer bungalow, replacement of existing septic tank with secondary effluent treatment system and all associated site works / 0.5 km away / 06 November 2018Granted
- 17462The erection of a straw bedded cattle shed, a manure pit with an underground seepage tank and working aprons with all associated facilities and site works / 0.6 km away / 16 June 2017Granted
- 19518(a) Erection of a single storey type house, (b) garage / fuel store for domestic use, (c) the installation of Oakstown BAF wastewater treatment plant with percolation area and (d) construct a new vehicular recessed entrance and all associated site works / 0.7 km away / 02 July 2019Granted
- 21434Two storey style dwelling, wastewater treatment system, new recessed entrance and all associated site works / 1.0 km away / 07 October 2021Granted
- 22991(1) Retention of development as constructed including amended red line site boundary to that permitted under Planning Reference 06/11. (2) Modifications to dwelling size and location to that permitted under Planning Reference 06/11. (3) Retention for detached domestic garage of c. 36m² as constructed on site. (4) Modifications to entrance as granted under Planning Reference 06/11. (5) Retention for effluent treatment system in lieu of septic tank as granted under Planning Reference 06/11 / 1.2 km away / 03 October 2022Granted
- 221035The provision of a renewable biogas and biofertiliser production facility with an intake of up to 165,000 tonnes of feedstock per annum that will feed into the existing Gas Networks Ireland (GNI) network. The facility will comprise of: *Input weigh bridges and weighbridge offices; *Reception (incorporating offices, control room/laboratory, canteen, changing and toilet facilities) *Feedstock building and solid digestate store; *Boiler/plant maintenance including ESB and CHP store; *4 No digestor units and 1 No post digester unit, pre-acidification unit, biological desulphurisation and technical building all located within a containment bund; *Covered storage tanks; * Silage clamps; *Connection to existing Gas Network Ireland infrastructure The proposed development includes for associated biogas tank; gas upgrade units (5 no.); and an emergency gas flare. The development also includes air cleaner (feedstock area); 5 no. air cleaner stacks and 2 no. boiler and CHP plant flues; odour abatement, firefighting water tank; attenuation pond, a new gated access from R445; internal access roads, car parking, loading bays and laybys, landscaping and boundary fencing. A personnel gate is proposed to the north of the site. The proposed development comprises all associated site development, drainage and infrastructure works above and below ground. The maximum height of the proposed development is the digester units at c.141m above ground level. The proposed facility will primarily utilise spent grains from breweries along with smaller quantities of other brewery by products such as yeast and discarded beer. Maize will also be accepted in smaller quantities as a feedstock to produce biogas which will be upgraded to bio methane and fed into the natural gas grid. Carbon Dioxide will be recovered as a by-product as part of the process. Solid and liquid digestate that will be produced from the process will be a biofertiliser. No waste materials will be accepted as feedstock at the facility. An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) have been prepared in respect of the proposed development on a site of approx. 7.9Ha. Revised by Significant Further Information which consists of revisions to the site access and works to the road and footpath alongside the site including the provision of public lighting, signage, anti-skid surfacing and a crash barrier. Tactile paving and dropped kerbs are proposed where required and there are c / 1.3 km away / 22 June 2023Granted