Mullamast, Ballitore, Athy
Planning application 2560233
DecisionConditional grant
Decided28 April 2025
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Mullamast, Ballitore, Athy?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 211447For the construction of a detached, single-storey dwelling accessed from the existing entrance and avenue to Mullamast House; the provision of landscaping, including boundary treatments; and the provision of all other associated site excavation, infrastructural and site development works above and below ground, including waste water treatment system and percolation area / 0.3 km away / 26 January 2022Granted
- 181103Retention permission for existing rear extension and dormer extension to existing detached house, permission for the construction of a single storey front extension to existing detached house, modifications to internal arrangement of existing detached house and modifications to front facade of existing detached house and all associated site works / 0.7 km away / 01 November 2018Granted
- 2460189For constructing 29 dwellings consisting of 8 no. apartments in 2 No. 2-storey blocks, 8 No. terraced houses in 2 No. 2-storey terrace blocks, 10 No. semi-detached 2-storey houses, and 3 No. detached houses. The development also consists of a new recessed vehicular entrance, provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment and mid-terrace units, connection to foul water sewer, new footpath connecting to existing footpath and all associated ancillary site-works / 0.8 km away / 09 August 2024Granted
- 17391For the construction of a single storey extension to the side of the existing dwelling and all associated site works / 0.8 km away / 01 June 2017Granted
- 17350The erection of a straw bedded cattle shed with a soiled water tank and working aprons with all associated facilities and site works / 0.8 km away / 23 May 2017Granted
- 2561216Constructing a creche and 34 dwellings. The dwellings will consist of 8 no. apartments in 2 No. 2-storey blocks, 22 No. semi-detached 2-storey houses, and 4 No. detached 2-storey houses. The development also consists of a provision of part transportation objective T1 as defined in the KCC Development Plan 2023-2029, individual bin/bike stores for each apartment unit, connection to foul water sewer, and all associated ancillary site-works / 0.8 km away / 31 March 2026Granted
- 2471Planning permission sought for bungalow, domestic garage, connection to all services, new entrance through existing estate and ancillary works / 0.9 km away / 04 November 2024Granted
- 2560639For constructing 8 No. dwellings consisting of 2 No. detached 2-storey houses and 2 No. 2-storey terrace blocks consisting of 3 No. houses each. The development also consists of individual domestic vehicular entrances off Abbeyfield and Mill Lane, new shared cycle / footpath along Mill Lane, connection to foul water sewer, and all associated ancillary site-works. Revised by Significant Further Information which consists of: The principal amendments to the original scheme entail 1) revised site layout including revised access arrangements; 2) revised building designs; 3) revised landscaping and boundary treatments; and 4) revised location of cycle path / 0.9 km away / 14 May 2026Granted