Unit A Maudlins Industrial Estate, Monread Road, Naas
Planning application 2560517
DecisionConditional grant
Decided08 October 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Unit A Maudlins Industrial Estate, Monread Road, Naas?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 181536The change of use of an existing part single storey / part three storey industrial unit to a training centre. The proposed development consists of the change of use of the industrial unit to a training centre, to include the sub-division of part of the main ground floor full-storey element into 2 no. workshops / training areas, tutor rooms and associated support accommodation, along with the provision of new external windows and doors to the side and rear elevations. The application also includes the retention of a first floor mezzanine of 168 sq. meters, which will accommodate 2 no. teaching spaces and ancillary support accommodation, together with all associated siteworks / 0.0 km away / 18 September 2019Granted
- 23415The development will consist of: the retention of a steel frame industrial building extension (247sqm) located to the south east of the existing unit and all ancillary works / 0.0 km away / 09 June 2023Granted
- 20294The construction of an extension to Maudlins House Hotel which was constructed under planning permission 00/500124, over an existing basement car park. The proposed extension comprises of 70 no. aparthotel rooms over 6 floors including a meeting room on each floor with a single storey pedestrian link bridge/walkway to the existing hotel building and all associated facilities. All goods deliveries will continue to the existing delivery yard and the existing Maudlins House Hotel entrance and frontage to the Dublin Road will remain unchanged. All foul and surface water discharge are to be connected into existing foul and surface water systems (network on site) with final discharge to the public mains. The planning is made further to planning applications 98/500157, 00/500113, 00/500124, 02/500024 and 07/500124. The development consists of works being carried out in the curtilage of protected structure “Maudlins Farmhouse” RPS Ref. NS 19-096 / 0.0 km away / 21 December 2020Granted
- 19615For: (a) Internal modifications to layout to provide ancillary office accommodation; (b) Minor alteration to existing North West facing side elevation for retention of window unit to canteen on ground floor, and all associated site works / 0.0 km away / 18 July 2019Granted
- 2560954Of a replacement flue of height 25 m above ground level (AGL) and diameter of 2.5 m, located adjacent to an existing industrial building within an industrial complex, and all ancillary works / 0.1 km away / 14 October 2025Granted
- 24117Development will consist of the provision of a new pedestrian entrance to the front elevation, new free standing service sign in front of the new entrance, new service pylon at the entrance and 3 no, flagpoles all to the existing car showroom. / 0.1 km away / 28 May 2024Granted
- 181490Proposed truck washing facilities comprising of: (a) The construction of 1 No. truck washing station and associated works. (b) New plant room - 6 sqm. (c) Provision of signage. (d) And all ancillary works / 0.1 km away / 10 April 2019Granted
- 201030Alterations to exterior of existing office building to include new first floor cladding, windows and new back-lit halo signage, new replacement entrance lobby, canopy and extended link wall to new "totem" sign with back-lit halo lettering / 0.2 km away / 23 October 2020Granted