GrantedDecided 03 October 2025Kildare County Council

A 1.6654 Ha site incorporating Unit 1 Esprit Logistics Park, Moortown, Celbridge

Planning application 2560650
DecisionConditional grant
Decided03 October 2025
Application typePERMISSION
Source documents1

Site

What is on file

0refusal reasons0conditions8nearby records

Proposed development

Application description published by Kildare County Council.
For amendments to the Warehouse and Light Industrial Development permitted under Kildare County Council Reg. Ref. 22/627 (as amended by Kildare County Council Reg. Ref. 24/87 and 24/88 and proposed to be amended by Kildare County Council Reg. Ref. 25/60553 and 25/60601) and amendments to an existing Maintenance Station-Aviation Industry Light Industrial Unit (currently operated by Lufthansa Technik). The amendments principally comprise: the omission of Unit A (a permitted Warehouse with a Gross Floor Area of 2,708 sq m) and the relocation of the existing delivery yard and select existing car parking spaces to facilitate the construction of an extension to the existing Maintenance Station-Aviation Industry Light Industrial Unit. The extension, which requires the removal of the existing northwest facing gable wall (17.6 sq m), will have a maximum height of 13.15 metres and a Gross Floor Area of 3,990 sq m (resulting in the overall Maintenance Station-Aviation Industry Light Industrial Unit having a Total Gross Floor Area of 7,710 sq m). The development will also include: the decommissioning of the existing site entrance to / exit from the Maintenance Station-Aviation Industry Light Industrial Unit in Esprit Logistics Park. Access to / egress from the proposed extended Maintenance Station-Aviation Industry Light Industrial Unit will be via the proposed reconfigured permitted Unit A site access / egress. The development will also include: the omission of the permitted height restrictor at the site access / egress at the R405; the provision of 21 No. car parking spaces in lieu of the 27 No. previously permitted to serve Unit A (resulting in the overall Maintenance Station-Aviation Industry Light Industrial Unit having 101 No. car parking spaces); gates; canopy; plant; modifications to the permitted hard and soft landscaping and boundary treatments; and all associated site and development works above and below ground. Revised by Significant Further Information which consists of: elevational changes including the addition of green walls, revised curtain walling, windows, and cladding; landscape modifications including planted landscaped berms and additional planting; modifications to boundary treatments and gates; changes to the car parking layout and the addition of zebra crossings

Application and appeal history

Structured appeal stages, outcomes and source documents currently tied to this application.

No indexed appeal history

No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.

Decision details

Core application dates and identifiers from the public planning record.

Planning analysis

Refusal reasons and planning conditions extracted from the public decision file.

Refusal reasons

No refusal reason on record

Documents are indexed. Reason extraction for Kildare has not started yet.

Conditions

No conditions

No conditions are on record for this application yet.

Planning a project near A 1.6654 Ha site incorporating Unit 1 Esprit Logistics Park, Moortown, Celbridge?

Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.

Source documents

Original council portal records and source PDFs where available.

Nearby precedent

Similar nearby applications linked to this planning decision.
Get up to 80 detailed nearby comparables in a site risk brief →