Planning application 2560928
DecisionConditional grant
Decided02 October 2025
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Fodeens, Kill, Co. Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2460770For a single storey dwelling serviced with an onsite waste water treatment system to current EPA guidelines, with equine facilities comprising of; a farm building (containing 4 stables, a tack & wash room, a feed room & barn storage), to be serviced with a dung stead & effluent holding tank complete with yard area & sand arena all to the rear of the above dwelling where the dwelling & equine facilities will be accessed via a singular recessed entrance, and for all associated site works / 0.0 km away / 12 November 2024Granted
- 22323Of a garage (26.3m²) to the north of the house and a storage shed/workshop (112.4m²) to the north-west of the house / 0.4 km away / 16 May 2022Granted
- 191370To construct: (1) A water storage tank 14.70m in diameter and 2.30m in height; (2) A storage container with area of 15sqm for associated plant and all associated siteworks. Revised by significant further information consisting of; revised site layout including proposal to provide a new site entrance approx. 192m southwest of existing entrance and 2 no. existing entrances to be closed / 0.9 km away / 10 July 2020Granted
- 171376Construction of a detached dwelling (part single/part two-storey) with waste water treatment plant and percolation area, associated landscaping and boundary treatment works, a new single storey garage and alterations to an existing vehicular entrance off of the road at Willow Lodge / 1.0 km away / 18 April 2018Granted
- 2460958For the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works / 1.3 km away / 20 November 2024Granted
- 23276For a second phase of the existing grid system services facility within the existing grid system services facility within the existing site area of c1.95 hectares, which was granted via reference number 18/247. The second phase will utilise all existing infrastructure, including the EirGrid gird connection infrastructure, site roads, 110kV substation, compounds, and all ancillary services. The proposed new works will consist of the installation and operation of battery energy units, including 1 no. customer switchgear container which will be connected to the national grid, via the existing infrastructure,electrical transformers and inverter units, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, internal access road and all associated ancillary infrastructure on land at / 1.3 km away / 11 May 2023Granted
- 18247Development of a grid system services facility within a total site area of up to 1.95 hectares, to include 1no. TSO compound including 1no. single storey TSO electrical substation building and 1no. single storey customer substation, 1no. customer switchgear, electrical inverter /transformer station modules, containerised battery storage modules on concrete support structures, heating, ventilation and air conditioning units (HVAC units), access tracks and upgraded site entrance, associated electrical cabling and ducting, security gates, perimeter security fencing, CCTV security monitoring system, culverts and landscaping works and all associated ancillary infrastructure / 1.3 km away / 03 May 2018Granted
- 20745The development of a new electrical substation and additional equipment in the existing ESB Kilteel 110kV Substation to facilitate the connection of the Porterstown Battery Storage Facility (Planning Ref 18/247) The total site area is 1.2 hectares. The new electrical substation will include 1 control building (GRP Containerised Substation), a 110kV transformer, surge arresters, instrument transformers, a 110kV busbar connecting to the ESB substation, a lightning mast and other electrical equipment to be installed on concrete support structures. Additional features will include palisade fencing, security gates, access tracks, external lighting, drainage, associated electrical cabling and ducting, CCTV security monitoring system, landscaping and all associated ancillary infrastructure. The additional equipment to be installed in the ESB substation to facilitate the connection of the new substation will include a 110kV busbar extension, a 110kV transformer bay, a 110kV coupler bay, a 110kV busbar connecting to the new substation, an interface kiosk, palisade fencing, a lightning mast and all associated ancillary infrastructure required for the connection / 1.4 km away / 01 September 2020Granted