35 Upper Saint Josephs Terrace, Athy, Co Kildare
Planning application 2561332
DecisionConditional grant
Decided08 May 2026
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near 35 Upper Saint Josephs Terrace, Athy, Co Kildare?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 21412Of single storey extension to the rear of existing two storey dwelling / 0.1 km away / 19 May 2021Granted
- 22857An existing front extension, including a projecting bay window and pitched roof over / 0.2 km away / 01 September 2022Granted
- 20996To construct an extension to dwelling house and associated site work, / 0.3 km away / 21 October 2020Granted
- 2560169For a single storey extension to the front, side and rear of existing single storey dwelling, changes to existing external façade, internal alterations, connection to existing services and all associated site works. Revised by Significant Further Information which consists of the inclusion of a family flat along with proposed single storey extensions / 0.3 km away / 21 July 2025Granted
- 17382Single storey side and rear extension to existing dwelling house, construction of a new garage, construction of a new storage shed and all associated site works / 0.3 km away / 31 May 2017Granted
- 18472The erection of a single storey prefabricated building comprising 3 No. general classrooms with toilet facilities (area c. 56.5 msq each) along with all other relevant site works / 0.3 km away / 19 June 2018Granted
- 24112Development will consist of 76 no houses, and a creche, on a site measuring circa 2.68 hectares, located in the townland of Tomard, south of Cluain Bhearu residential development, east of the Monasterevin Road / Rathstewart Road (R417) and White Castle Lawn, Athy, Co. Kildare. The proposed development is comprised of 10 no. 4 bedroom, 54 no. 3 bedroom and 12 no. 2 bedroom storey, detached, semi detached and terraced houses. A single storey creche of c.378sq.m is also proposed. Access to the proposed development will be from the adjoining Cois Bhearu to the north. The proposed development includes for all associated site development works, car parking, open spaces, hard & soft landscaping etc., ESB substation, and demolition of all structures on site. Revised by Significant Further Information which consists of 91 no. houses, and a crèche, on a site measuring circa 3.1 hecatares. The proposed development is comprised of 14 no. 4 bedroom, 65 no. 3 bedroom and 12 no. 2 bedroom, 2 storey, detached, semi-detached and terraced houses. A two storey crèche of c.264.6sq.m is also proposed.. Access to the proposed development will be from the adjoining Cois Bhearú to the north. The proposed development includes for all included site development works, car parking, open spaces, hard & soft landscaping etc., ESB substation, demolition of the mill structure on site, and extension and upgrade of footpath to cycle path to the north-west at Corráin Bhearú to connect to path on Monasterevin Road / Rathstewart Road (R417). The applicant has also submitted a concurrent application to the Planning Authority for a residential development of 38 no. dwellings on the adjoining lands to the immediate south under planning Ref. 24/111 / 0.4 km away / 10 December 2024Granted
- 24111Development will consist of 50 no. houses, on a site measuring circa 1.85 hectares, located in the townland of Tomard, south of the Cluain Bhearu residential development, east of the Monasterevin Road / Rathstewart Road (R417). The proposed development is comprised of 19. no. 4 bedroom and 31 no. 3 bedroom 2 storey, detached, semi-detached and terraced houses. Access to the proposed development will be from the adjoining Cois Bhearu to the North. The proposed development includes for all associated site development works, car parking, open spaces, hard and soft landscaping etc, ESB substation, and demolition of all structures on site. Revised by Significant Further Information which consists of 38 no. houses, on a site measuring circa 1.58 hectares. The proposed development is comprised of 31 no. 3 bedroom and 6 no. 1 bedroom, 1 & 2 storey, detached, semi-detached and terraced houses, and 1 no. 2 bedroom masionette. The existing ‘‘Miller’s House’’ is to be retained and renovated into the proposed 2 bedroom dwelling. Access to the proposed development will be from the adjoining Cois Bhearú to the north. The proposed development includes for all included site development works, car parking, open spaces, hard & soft landscaping etc., ESB substation, demolition of the mill structure on site, and extension and upgrade of footpath to cycle path to the north-west at Corráin Bhearú to connect to path on Monasterevin Road / Rathstewart Road (R417). The applicant has also submitted a concurrent application to the Planning Authority for a residential development of 91 no. dwellings and a creche on the adjoining lands to the immediate north under planning Ref. 24/112 / 0.4 km away / 06 December 2024Granted