Orchard Garden Centre, Dublin Road, Ballyoulster
Planning application 2614
DecisionRefused
Decided25 March 2026
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kildare County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Kildare has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Orchard Garden Centre, Dublin Road, Ballyoulster?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18254Retention of existing detached timber structure on the site. Permission is sought for an extension (or link) from the aforementioned detached timber structure on the site to the main cottage on site ( note the extension was previously approved by An Bord Pleanala under planning reference number PL09.243283). the extension/link element will function as a living room. The timber structure and the link element together will thus become an extension of the existing cottage and the completed development will function as one dwelling. Also permission is sought to provide a new interconnecting door from the extension/link to the main cottage and to replace the existing timber finish with a rendered fibre cement board finish and all associated site works. / 0.3 km away / 04 May 2018Refused
- 17721For a fully serviced dwelling house and domestic garage and associated site works using the existing entrance onto the Loughlinstown Road at the rear of / 0.5 km away / 14 August 2017Refused
- 21948For development consisting of the construction of a three bedroom (plus farm office), single storey, detached dwelling house, new site entrance off existing private access roadway to stud farm, and all associated site works, landscaping, drainage etc., located on lands at / 0.5 km away / 23 August 2021Refused
- 2560662For the construction of 2no. two-storey detached dwellings, together with independent septic tanks and percolation areas and all associated site works and landscaping to the rear. Revised by Significant Further Information which consists of: 1.no detached dwelling has been omitted. The development now comprises 1no. detached dwelling, the design of which has been revised to become a storey-and-a-half style with an adjoining single-storey garage, complete with revised landscaping, SuDs features and vehicular entrance / 0.5 km away / 20 February 2026Refused
- 201233Retaining a mobile home temporarily for the duration of construction, permission to construct a dormer bungalow type dwelling, connection to public foul drain system, removal of condition 1 of planning file reference number 8455 relating to sterilisation of lands, and all associated ancillary site works, / 0.6 km away / 01 December 2020Refused
- 19702The change of use of part of the ground floor of existing Light Industrial Building from existing office and associated use to new Retail and associated use, for alterations to front façade to include new entrance doors, over head canopy/awning and new high level façade signage, and for minor alterations to existing car parking to front, and other minor internal and external associated works, all located / 0.6 km away / 14 August 2019Refused
- 2560832For a new 3-bedroom single storey dwelling with right of way through 403 & 403a Ballyoulster park and all associated site works / 0.6 km away / 15 September 2025Refused
- 22313825STRATEGIC HOUSING DEVELOPMENT: for a seven year planning permission, on lands at Dublin Road and the Skinkeen Road, within the townlands of Donaghcumper and Ballyoulster, Celbridge, Co. Kildare. The application site has an area of c. 13.4 ha and bound by a greenfield site, Donaghcumper Cemetery, Retronix Semiconductor Company and the Dublin Road to the north, the Rye River Brewing Company and the Ballyoulster Park housing estate to the north east, the Primrose Gate housing estate to the south, agricultural lands to the east and Shinkeen Road to the West. Donaghcumper Medieval Church Ruins (RPS No. B11-02) and the house on Dublin Road, Donaghcumper (RPS No. B11-26), are protected structures located north of the application site. The proposed development comprises 344 No. residential units (comprising 54 No. 1 beds, 30 No. 2 beds, 210 No. 3 beds and 50 No. 4 beds), a 2 No. storey childcare facility with a GFA of c. 369 sq. m, public communal open space, landscaping, car and cycle parking spaces, provision of an access road from Dublin Road and Shinkeen Road, associated vehicular accesses, internal roads, pedestrian and cycle paths, bin storage, cycle storage, pumping station and all associated site and infrastructural works. The residential component of the development consists of 214 No. apartments/duplex units, and 130 No. houses. The development includes a total of 585 No. car parking spaces, 4 No. loading bays and a total of 770 No. cycle spaces. The proposal includes hard and soft landscaping, lighting, boundary treatments, the provision of public and communal open space, including 3 No. Local Parks, children’s play areas, and an ancillary play area for the childcare facility. The proposed development includes road upgrades, alterations and improvements to the Dublin Road/R403 and the Shinkeen Road, including the provision of new vehicular accesses and signalized junctions, pedestrian crossing points, and associated works to facilitate the same. The proposal includes internal roads, including 3 No. bridge crossings, cycle paths, footpaths, with proposed infrastructure and access points provided up to the application site boundary to facilitate potential future connections to adjoining lands. The development includes foul and surface water drainage, pumping station, 3 No. ESB Substations, services and all associated and ancillary site works and development / 0.8 km away / 02 January 2026Refused