Ballymorris, Mullinavat, Co. Kilkenny
Planning application 18782
DecisionConditional grant
Decided07 May 2019
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballymorris, Mullinavat, Co. Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 2360123For the construction of a dwelling house, a garage, a new entrance, a septic tank and percolation area and all associated siteworks / 0.4 km away / 12 October 2023Granted
- 2473To renovate existing two storey derelict cottage to consist of ground and first floor bedrooms with en-suite and construct a two-storey extension comprising of ground floor entrance hall, open plan kitchen / dining, sitting room area and utility room with first floor master bedroom and en-suite and attic storage space, install new wastewater treatment system and percolation bed and connect to existing mains water supply in the public road set back corner ditch at existing entrance to achieve sightline with all associated site works to our property / 0.5 km away / 09 September 2024Granted
- 2460606To ERECT DWELLINGHOUSE, DOMESTIC GARAGE AND ALL ASSOCIATED WORKS / 0.6 km away / 07 March 2025Granted
- 20383To erect slatted shed with lieback and all associated works / 0.6 km away / 13 August 2020Granted
- 18301For indefinite retention of reinforced concrete and block walls on three sides of property to retain lands of adjacent properties, the indefinite retention of front boundary wall and apply for Planning Permission to render/plaster and cap the front boundary wall and side boundary block walls at / 0.9 km away / 27 June 2018Granted
- 22292To construct a dwelling house, garage, sewerage treatment system and percolation area, including all necessary site works / 0.9 km away / 19 January 2023Granted
- 2560382Of works carried out to date on planning permission P2360215, namely (a) demolition of west gable boundary wall of the original dwelling house (b) the demolition of part of south boundary wall of the original dwelling house, (c) construction of base of extension to floor level. Also for planning permission to complete the works in relation to the above planning reference, namely (a) reconstruction of part demolished south facing wall, (b) the replacement of the old demolished walls with new modern build construction, (c) to complete the works to the remaining stone structure and (d) to complete the construction of the extension to the old dwelling. Note all finishes as per the original application and all other works as per the original application, including all necessary site works / 1.0 km away / 11 August 2025Granted
- 2360215To construct a dwelling house and to convert existing sheds to a garage, to demolish two existing buildings on site, with connections to the existing mains sewerage and mains water, including all necessary site works / 1.0 km away / 30 January 2024Granted