Barna, Freshford, Co. Kilkenny
Planning application 20255
DecisionConditional grant
Decided07 July 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Barna, Freshford, Co. Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18372For the following farm development. Erect slatted shed and all associated works / 1.3 km away / 25 July 2018Granted
- 19273To construct 20 no. pig finishing pens with total area of 386.6 sq meters with underground slurry storage tank and all associated site works / 1.7 km away / 24 July 2019Granted
- 22509A two storey side extension/alterations to existing two storey dwelling & alterations to existing roofs including all associated site works / 1.7 km away / 18 July 2023Granted
- 21627For a ten-year appropriate period planning permission for development of this site; the proposed development will constitute the provision of the following: The installation of 31.49km of a 38kV underground electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated development in the townlands of Killeen, Rathmacan, Gortnagap, Kyleballyoughter, Courtstown, Raheen, Lates, Curraghscarteen, Canvarstown, Trenchardstown, Lisnalea, Hillend, Coldharbour, Killahy, Greenhill, Lughinny, Craddockstown, Tubbrid Lower, Clomantagh Lower, Barna, Newtown, Kilrush, Belville, Lodge, Garranamanagh, Balleen Lower, Lodge, Tifeaghna (Browne), Lodge Demesne West, Lodge Demesne East, Clontubbrid, Clone, Acragar, Skinstown, Lisdowney, Seskin South, Parksgrove Ballyragget & Moatpark, Co. Kilkenny. Advisory Note: The full extent of the grid connection is 33.8km, and a separate planning application will be made for an underground grid connection to Tipperary County Council. The development comprises part of an overall development for which planning permission was granted for a 9 turbine wind farm and all associated works on lands located in the townlands of Farranroy Upper, Farranroy Lower, Coolnashinnagh & Gortnasmuttaun, Co. Tipperary. The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement. / 1.7 km away / 24 August 2022Granted
- 2360248For an amendment to planning application previously granted under reference PL/21/627 in the townlands of Killeen, Rathmacan, Gortnagap Kyleballyoughter, Courtstown, Raheen, Lates, Curraghscarteen, Canvarstown, Trenchardstown, Lisnalea, Hillend, Coldharbour, Killahy, Greenhill, Lughinny, Craddockstown, Tubbrid Lower, Clomantagh Lower, Barna, Newtown, Kilrush, Belville, Lodge, Garranamanagh, Balleen Lower, Lodge, Tifeaghna (Browne), Lodge Demesne West, Lodge Demesne East, Clontubbrid, Clone, Acragar, Skinstown, Lisdowney, Seskin South, Parksgrove Ballyragget & Moatpark, Co Kilkenny. The previously consented planning application comprised the installation of 31.4 km of a 38kV underground grid connection comprising cable ducting and associated electrical cabling and all other ancillary works including joint bays, culverts, maker posts and all associated development. The proposed amendments to the previously consented grid connection comprise: • Increase in number of joint bays along the extent of the grid connection from a total of 35 to 45 joint bays • Grid connection to be operated at 38kV but installed to a 110kV underground cable design standards/infrastructure • Minor Adjustments to the route and red line boundary / 1.8 km away / 06 December 2023Granted
- 23179To build single storey dwelling, renovate existing shed, effluent treatment system, site entrance and associated site works / 1.8 km away / 20 October 2023Granted
- 17589For the construction of telecommunications infrastructure comprising of: a 36 metre multi-operator lattice tower with antenna and dishes attached, associated equipment and cabinets, fencing, use of existing access and access track and extension of access track. / 1.8 km away / 09 January 2018Granted
- 19895To build a dwelling, domestic garage, entrance and install waste water treatment system including associated site works / 1.9 km away / 04 February 2020Granted