Ballylinch Stud, Ballylinch Demesne, Thomastown
Planning application 20651
DecisionConditional grant
Decided19 November 2020
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballylinch Stud, Ballylinch Demesne, Thomastown?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 19963For 2 no. separate foul water treatment systems to service individual single toilet facilities to EPA standards with all associated works, one each at Powerwood Barn and at The Priory Bell Barn located within / 0.2 km away / 19 February 2020Granted
- 19856For (a) Construction of 2 storey side and rear extension to Ballylinch House (requiring demolition of section of yard wall and lean-to store) containing new main entrance and reception area, meeting rooms, offices, staff and visitor facilities and ancillary plant and comms. rooms etc. (b) Internal and external alteration to Ballylinch House to improve universal access including refurbishment of existing residential accommodation at first floor level. (c) Upgrading of existing yard/car park including demolition of lean-to sheds to provide improved staff and visitor car parking. (d) Provision of new and improved drainage and utility services including construction of foul effluent septic tank and pumping station to include plant room with rising main from the pumping station across the estate lands and along Station Road, discharging to an existing manhole/the public mains foul sewer which discharges to the Thomastown effluent treatment plant. (d) Hard and soft landscaping, boundary treatments and associated site works to enhance the setting of the extended Ballylinch House and to facilitate universal access / 0.7 km away / 28 February 2020Granted
- 1759To undertake reinstatement and remedial works to The White Bridge which connects Ballylinch Stud and Mount Juliet. The White Bridge is a Protected Structure (Register of Protected Structures Reference D.24). The reinstatement and remedial works shall generally comprise repairs and strengthening works to the bridge piers on the upstream side, repair works to the bridge upstream face and arches, strengthening works and scour protection to the bridge apron at various locations, re-grading and re-profiling of a small area of eastern upstream embankment and resurfacing of the bridge deck. A Natura Impact Statement will be submitted to the Planning Authority with the application / 0.9 km away / 31 March 2017Granted
- 19729For a single storey extension to the rear of premises known as Boher Lodge to include the removal of a flat roofed rear extension, foul connection to the public mains, alterations and associated site works / 0.9 km away / 15 January 2020Granted
- 22646For the demolition and removal of dairy farm structures and associated dairy elements to provide for a replacement equine farmyard facility. The removals include the existing milking parlour and associated stores, the slatted wintering shed and associated underground tanks, and a concrete apron. The new replacement structures include the following: 4no. separate stabling blocks each with 6no. loose boxes and stores, a covered walker and lunge, a covered dungstead with associated effluent holding tank and haybarn. Also, the upgrading of the existing farmyard entrance with sightline adjustment to the roadside boundary, fencing, access laneway, landscaping, provision of a replacement foul water treatment system to the associated farmhouse, boundary treatment and associated services / 0.9 km away / 19 January 2023Granted
- 2360227For the offset adjustment of the boundary wall at the road junction close to the / 1.0 km away / 25 July 2023Granted
- 18275The construction of a rear balcony over an existing flat roof and connecting walkways at / 1.0 km away / 04 September 2018Granted
- 19294For a change of use from agricultural to seasonal bell tent (glamping) development. The proposed development will consist of the seasonal erection of 5 no. Bell tents. Also planning permission to retain work on new site entrance to date, and complete new site entrance. Permission to retain is sought for change of use of an existing outbuilding that has been converted to a seasonal facility building with dining facilities, bathrooms, and showers for use during the glamping season, including alterations and change of use of an existing outbuilding that has been converted to a seasonal facility building for office during the glamping season, including alterations and all associated site works. This is a protected structure / 1.0 km away / 19 December 2019Granted