Ballyconra, Ballyragget, Co. Kilkenny
Planning application 21827
DecisionConditional grant
Decided25 November 2021
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballyconra, Ballyragget, Co. Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20516For development at this site. The development will consist of A Packaging Intake Building, A Butter Despatch comprising two butter despatch docks, An extension of the existing roadside boundary wall, Alterations to the existing building elevations, Associated site works. The proposed development will result in improved site safety, operational efficiency and containment of material deliveries and butter despatch. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency. / 0.0 km away / 02 November 2020Granted
- 21882For the installation of 2 new cooling tower units and associated concrete bases at the existing Waste Water Treatment Plant and associated ancillary site works. Upgrade works to the existing watermain consisting of the installation of a new watermain connecting existing water reservoir tank in the Glanbia Milk Processing Facility to the existing pump house including the crossing of the N77 public road and all ancillary site works. Upgrade of the existing effluent line to include the construction of a new effluent line connection from the Glanbia Milk Processing Facility and the existing Waste Water Treatment Plant including a crossing of the N77 public road and all ancillary site works. Installation of services across the N77 public road and all ancillary site works. The milk processing facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement has been prepared and accompanies this application / 0.1 km away / 10 March 2022Granted
- 1773For Milk Powder Processing Building including alterations to adjacent existing buildings, partial demolition and extension to the existing Boiler House; demolition of an existing penthouse and its replacement with a similar but higher bag off penthouse; alterations and extension to the Amenity Building; site development works including drains, realignment of an existing road, development of a new truck marshalling area, truck parking and all associated works. The new Milk Powder Processing Builder and the penthouse will accommodate additional processing equipment to meet market demand for particular products and to improve product quality. The application also seeks permission for works at the Waste Water Treatment Plant comprising new equipment and the provision of three new concrete waste water treatment tanks and all associated works. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency. The works proposed at the Waste Water Treatment Plant are designed to ensure that treated waste water discharged to the River Nore will continue to comply with the conditions of the Licence / 0.1 km away / 05 April 2017Granted
- 19667For a two storey extension to their existing Research and Development Facility to accommodate a pilot plant, laboratories, storage, dryer and wet process rooms, associated equipment and roof mounted air handling equipment. Alterations to the existing Research and Development Facility to accommodate the extension that includes an increase in the first floor area, alterations to northern and western elevations and installation of roof mounted air handling equipment. An extension to an existing carpark North of the site. A new carpark South of the site. Associated site works including a pipe bridge, earthworks retaining walls, pedestrian routes, drains and services including car park lighting. The extension and alterations to the existing Research & Development Facility will provide a controlled and hygienic environment for product testing and development. The new car parks north and south of the plant will replace parking spaces (57 no. spaces) removed to facilitate the extension to the Research and Development Facility and will provide an additional 54 no. spaces. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency / 0.2 km away / 12 November 2019Granted
- 21519For development which will consist of: An extension to the existing Bio Solids De-watering Building for the installation of new equipment and material storage along with a new external silo and associated concrete bund: a new concrete yard to access the building extension and all associated effluent and storm drainage networks: new security fencing and sliding gate and modifications to the existing entrance: replacement of existing Dissolved Air Flotation (DAF) system with a new DAF System; landscaping and all associated site works. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. The application will be accompanied by a Natura Impact Statement (NIS). / 0.2 km away / 05 August 2021Granted
- 22386For development at their site, the development will consist of: The proposed replacement of an existing Heater Battery through the installation of a new unit complete with supporting platform, to be positioned on an existing roof, all complete with the provision of an external access stairs serviced through an extension of an existing external stairs and all associated site works. The proposed development will result in improved operational efficiency, improved energy efficiency and site safety. The milk processing plant site holds an industrial emissions licence issued by the Environmental Protection Agency / 0.2 km away / 04 August 2022Granted
- 22687For development. The proposed development will consist of: Construction of two anaerobic digesters, one equalization tank to include concrete base, earth embankment and associated works; construction of biogas storage dome with biogas flare, desulfurization unit; construction of membrane and control building with yard slab and link road; construction of ferric chloride storage tank; installation of a new pipeline with underground and overground sections for the purpose of conveying renewable biogas to the Glanbia facility east of the N77 road; realignment of the existing internal road to facilitate vehicle movements; drainage works and all associated site works including landscaping. The dismantling and removal of an existing disused sludge mixing tank; dismantling and removal of an existing biotower. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement (NIS) will accompany this application / 0.2 km away / 27 February 2023Granted
- 17817For permission for development at their Milk Processing Plant comprising: - A process building to accommodate 14 process tanks and associated equipment, associated plant and equipment rooms and roof mounted air handling equipment. - Links to the existing Whey Factory and Workshop. - Associated site works including earthworks, retaining wall, drainage and road diversions, pipe and service bridges and the removal of existing external process tanks. - Electrical plant rooms to be located on top of an existing factory building to replace an existing electrical room inside the building. The new process building will provide a controlled and hygienic environment for existing product storage. The new electrical plant rooms are required to relocate an existing internal electrical room which is substandard and no longer acceptable. The milk processing plant site holds on industrial emissions licence issued by the Environmental Protection Agency / 0.3 km away / 07 February 2018Granted