Gorteens, Slieverue, Co Kilkenny
Planning application 22297
DecisionConditional grant
Decided30 June 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Gorteens, Slieverue, Co Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 22480For a Maintenance Building, roof mounted solar panels and associate site works at Belivew Port, the building is to provide storage for port vehicles, workshops for the maintenance and storage of port machinery and equipment, ancillary office accommodation and welfare facilities at / 0.0 km away / 19 January 2023Granted
- 17763For development which will consist of the construction of an extension (198.3m2) to an existing warehouse (Unit 7); the installation in the extension of a conditioning plant, aqueous waste storage tank and bagging unit for Air Pollution Control Residues (APCR); the acceptance of 38,000 tonnes of APCR and 2600 tonnes of aqueous waste annually, which will be in addition to the 95000 tonnes of waste currently authorised; the operation of the conditioning plant and bagging unit in the extension; the storage of the conditioned and bagged APCR in Unit 7 (1455.7m2), and the deletion of Condition 3 c) of planning permission P13/585. The APCR will be classified as hazardous waste. The development will require a review of the Industrial Emissions Licence granted by the Environmental Protection Agency. An Environmental Impact Assesment Report (EIAR) will be submitted / 0.1 km away / 25 May 2018Granted
- 19328For a change of use at Units 3 and 4 Belview Port. It is intended to change its current warehousing use to allow for the acceptance and processing of non-hazardous waste into Solid Recovered Fuel (SRF) and for the composting of organic fines. The application will allow for acceptance and processing of up to 98,500 tonnes per annum at the facility. The application is accompanied by An Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) / 0.2 km away / 08 November 2019Granted
- 2460152For development, at Unit 2, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS). / 0.2 km away / 22 May 2024Granted
- 2460656For development, at Unit 1, Belview Port, Gorteens, Co. Kilkenny. The development will consist of the amendment of condition no. 3 Pl. Ref. 11/397 to include for the acceptance, unloading and storage of non-hazardous waste including construction and demolition waste, end of life tyres and other non-hazardous bulk wastes for onward export. The application is accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement (NIS) / 0.2 km away / 21 February 2025Granted
- 20738For development at this site address. The development will consist of an ESB medium voltage (MV) Unit Substation and adjoining Customer Switchroom (an external footprint of up to 31m2, gross floor space of up to 19.5m2 and up to 3m in height) and all other associated site development works, including drainage and underground electrical cabling and ducting, required to facilitate the development. The substation development will be contained entirely within the boundary of the existing Belview Port and will use existing access arrangements within the port facility. The application is accompanied by a Natura Impact Statement (NIS) / 0.3 km away / 05 January 2021Granted
- 20346For water supply and foul drainage works including all pipes, valves, chambers, connections, a foul waste water pumping station and associated site works / 0.3 km away / 20 October 2020Granted
- 22549For a single-storey extension to existing warehouse (BV2) to north of site, new storm water attenuation tank and the part realignment of existing concrete yard together with all associated site development works / 0.3 km away / 28 April 2023Granted