Rathduff, Thomastown, Co. Kilkenny
Planning application 2257
DecisionConditional grant
Decided25 March 2022
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Rathduff, Thomastown, Co. Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20507For retention of agricultural entrance for the movement of livestock across the L-4202 at the junction of the L-4202 & L-8200 and all associated site works / 0.5 km away / 16 April 2021Granted
- 18293For the erection of a cubicle house with slatted slurry storage tanks and feed passage and all associated site works at / 0.6 km away / 21 June 2018Granted
- 2460527For development of unroofed slatted feeding area over mass concrete tank, walled silage base, concrete aprons and associated site works necessary to facilitate the proposed development / 0.7 km away / 02 May 2025Granted
- 22519Existing extension to the rear of dwelling house and existing porch to the front of dwelling house and all associated site development works / 0.8 km away / 29 September 2022Granted
- 17674For development of: installation of 2 no. temporary shipping containers, one of which will contain a pressure filtration system, an the second of which will contain an ultraviolet (UV) disinfection system. - Installation of 3 no. temporary 36m3 above ground precast concrete tanks to accommodate backwash water and sludge from the filtration process. - The installation will be on the south-eastern gable of the existing control bulding and will be partially obscured from view by the natural topography of the land to the east. The River Nore to the west, a screen of mature trees on the southern boundary and the existing control building to the north of the proposed installation / 1.0 km away / 05 December 2017Granted
- 19876Permission is sought for alterations and revised Red Gate entrance arrangement to improve traffic safety to include removal of the existing gate and part of the boundary wall, set back of the proposed entrance gate and railings with associated masonry wing walls, road carriage way, landscaping and associated services at / 1.0 km away / 20 January 2020Granted
- 17309For development consisting of the amalgamation of the two semi-detached single storey houses into one dwellinghouse, removal of rear extension, removal of all roofs, a new first floor extension and roof, refurbishment throughout, a new waste water treatment system and associated site works / 1.3 km away / 30 August 2017Granted
- 19856For (a) Construction of 2 storey side and rear extension to Ballylinch House (requiring demolition of section of yard wall and lean-to store) containing new main entrance and reception area, meeting rooms, offices, staff and visitor facilities and ancillary plant and comms. rooms etc. (b) Internal and external alteration to Ballylinch House to improve universal access including refurbishment of existing residential accommodation at first floor level. (c) Upgrading of existing yard/car park including demolition of lean-to sheds to provide improved staff and visitor car parking. (d) Provision of new and improved drainage and utility services including construction of foul effluent septic tank and pumping station to include plant room with rising main from the pumping station across the estate lands and along Station Road, discharging to an existing manhole/the public mains foul sewer which discharges to the Thomastown effluent treatment plant. (d) Hard and soft landscaping, boundary treatments and associated site works to enhance the setting of the extended Ballylinch House and to facilitate universal access / 1.3 km away / 28 February 2020Granted