Bruckana Windfarm, Bruckana, Johnstown
Planning application 22679
DecisionConditional grant
Decided27 February 2023
Application typePERMISSION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Application and appeal history
Structured appeal stages, outcomes and source documents currently tied to this application.No indexed appeal history
No structured appeal case is tied to this application. This means no appeal is indexed, not that an appeal is impossible.
Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Bruckana Windfarm, Bruckana, Johnstown?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 20459The development will consist of alterations to a previously permitted wind farm development (Planning Register References 14/202, 15/629 & 19/787 (Kilkenny), 14/139 & 19/597 (Laois) and 14/510138 & 15/600924 (Tipperary) where the permitted development also extends into the townlands of Graigueadrisly, County Laois and Killoran near Templetuohy, County Tipperary. The proposed alteratons will consist of: increasing the tip height of the six permitted turbines from a maximum of 156m to a maximum of 169m and extending the operational lifetime of the wind farm, from the date of commissioning, from 25 years to 30 years. A ten-year permission is sought. The application is accompanied by a Natura Impact Statement, Planning Report and Environmental Considerations Report. Lisheen III Wind Farm Limited also intends to apply to Laois County Council for planning permission for development at Graigueadrisly, County Laois. The proposed alterations will consist of: increasing the tip height of two permitted turbines from a maximum of 156m to a maximum of 169m and extending the operational lifetime of the wind farm, from the date of commissioning, from 25 years to 30 years / 1.1 km away / 01 December 2020Granted
- 19787The development will consist of alterations to a previously permitted wind farm development (Planning Register References 14/202 & 15/629 (Kilkenny), 14/109 (Laois) and 14/510138 & 15/600924 (Tipperary)) where the permitted development also extends into the townland of Graigueadrisly, County Laois and Killoran near Templetuohy, County Tipperary. The proposed alterations will consist of: increasing the turbine rotor diameter of the six permitted turbines from a maximum of 113m to a maximum of 136m, while maintaining the overall tip height of up to 156m per the permitted development. A ten-year permission is sought. The application is accompanied by a Natura Impact Statemet, Planning Report and Environmental Considerations Report. Lisheen III Wind Farm Limited also intends to apply to Laois County Council for planning permission for development at Graigueadrisly, County Laois. The proposed alterations will consist of increasing the turbine rotor diameter of two permitted turbines from a maximum of 113m to a maximum of 136m, while maintaining the overall tip height of up to 156m per the permitted development. / 1.2 km away / 13 December 2019Granted
- 20816The acceptance and processing of organic waste materials at the existing Anaerobic Digestion Facility of up to 30,000 tonnes per annum; glass lined steel digestate storage tank of 46.1m in diameter and 5.67m in height; an office building of 5.83m in height, 7.6m in width and 15m in length; and all associated site development works, ancillary works and equipment. The planning application is accompanied by an Environmental lmpact Assessment Report (EIAR) / 1.5 km away / 13 April 2021Granted
- 20820Existing onsite weighbridge; the existing office portacabin structure of 9m in length, 3m in width and 2.6m in height until end of 2022; the existing control room of 4.31m in height, 5.1m in width and 5.06m in length; the biofilter unit and associated pipework installed in its existing orientation; the existing pump house of 2.4m in height, 2.5m in length and 1.7m in width; the plant room of 4.82m in height, 7.66m in width and 7.9m in length; and associated ancillary infrastructure including an underground holding tank of 45m3 capacity; tank bund area of 10.5m in length and 3m in width and 668 sq.m area of hardstanding with provision for 7 no. car parking spaces / 1.5 km away / 17 September 2020Granted
- 18219To build an extension to existing cubicle house and slatted tank including associated site works at / 1.7 km away / 30 May 2018Granted
- 2361035The construction of an 1,800 sq.m sludge holding building of c. 60m in length, 30m in width and 13.5m in height, to incorporate an open faced biofilter to be installed at the western end of the facility building, for the acceptance and temporary storage of up to 12,000 tonnes per annum of sludges produced from wastewater treatment; internal site roads and parking; a 50 sq.m welfare/office facility of c. 10m in length, 5m in width and 5m in height; 1 no. surface mounted weighbridge; an electrical sub-station of c. 7.5m in length, 4.3 m in width and 3.2 m in height; underground holding tanks, infiltration areas and associated drainage pipework; pumphouse of c. 2.5m in width, 2.5 m in length and 2.8m in height; permeable and impermeable hardstanding; entrance gate and fencing and perimeter landscaping. An Environmental Impact Assessment Report has been submitted as a part of this application / 1.7 km away / 03 October 2024Granted
- 2260395A 10-year planning permission for development of a BioProducts Campus. The Bioproducts Campus development consists of an integrated Compost / Growing Media Facility and Anaerobic Digestion Facility as well as a Biorefinery. The Compost / Growing Media Facility comprises 1 No. composting building (incorporating feedstock intake area, storage area, in-vessel tunnels, workshop), solar panels at roof level, associated biofilter and liquid storage tanks, 1 No. maturation building and 1 No. office building. The Anaerobic Digestion Facility comprises 3 No. digester tanks, 2 No. digestate storage tanks, 2 No. biogas fuelled electricity generating gas engines, 3 No. biogas processing units, associated storage tanks, bunding, plant and 1 No. gas flare. The BioRefinery includes 1 No. building (incorporating a goods inward area, processing area, drying room, process control rooms, a laboratory and offices), associated feedstock storage tanks; a BioEnergy Facility comprising 1 No. biomass boiler building, associated water storage tank, 1 No. materials storage building. The integrated Compost / Growing Media Facility and Anaerobic Digestion Facility will accept up to 80,000 tonnes of waste materials per annum. Provision of new site access from the R502, internal access roads and hardstanding, car parking, fire water tank and retention pond, ESB substation and pump house, 4 No. weighbridges, entrance gate and security fence. The proposed development includes all ancillary site development, landscaping and boundary treatment works above and below ground. The application relates to development which comprises or is for the purposes of an activity requiring an Industrial Emissions Licence. An Environment Impact Assessment Report will be submitted with this application. / 1.8 km away / 21 November 2022Granted
- 19600984To construct a single storey replacement detached dwelling house, entrance, boundary walls, connection to existing public foul sewer, including all associated site works / 2.4 km away / 29 October 2019Granted