Ballygorteen, Castlewarren, Co Kilkenny
Planning application 24117
DecisionRefused
Decided11 November 2024
Application typeEXTENSION OF DURATION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
Refusal reasons not machine-readable
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Ballygorteen, Castlewarren, Co Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €29 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18859To construct a dwelling house, detached domestic garage, on site sewerage treatment, percolation area and all associated site works / 1.7 km away / 22 February 2019Refused
- 22274For construction of two storey dwelling, entrance, foul effluent treatment system, percolation area and all associated site works / 2.1 km away / 17 June 2022Refused
- 21816Is sought for the construction of a dormer style dwelling house, domestic garage, onsite wastewater treatment system, bored well, splayed entrance and all associated site development works at / 3.0 km away / 08 June 2022Refused
- 2560680To construct a grain store building, yard area, associated services hut, new septic tank and percolation area, associated access road and a new vehicular entrance to public road and to carry out all associated site developments works / 3.5 km away / 27 May 2026Refused
- 19608For the following works. The works consist of the following: Construction of 42 No. residential units comprising of 22 No. 3 Bed Semi Detached houses, 2 No. 3 Bed detached Houses, 4 No. 4 Bed Semi-Detached Houses, 5 No. 4 Bed Detached Houses, 1 No. Terrace consisting of 2 No. 3 Bed Dwellings & 1 No. 2 Bed dwelling and 3 No. 2 Story Apartment Buildings containing 2 No. 1 Bed Apartments per Building (6 No. 1 Bed Apartments in Total). Extension to existing housing estate road network to access the proposed site(s). Provision of new vehicular entrances to the proposed 4 Bed detached dwellings, Minor alterations to existing estate road network to improve road safety. Demolition of existing partially constructed plant building on the site and the construction of a new plant building. All associated site development works. / 3.5 km away / 17 June 2020Refused
- 2660224For change of use of existing car park to a builders storage yard and the temporary storage of 2 no. storage containers and all associated site works / 3.9 km away / 10 June 2026Refused
- 24135To construct a new extension to house. This is further to Planning Register Reference 13/465 / 4.2 km away / 30 July 2025Refused
- 2460210For development. The development will consist of: (i) All works (within County Kilkenny) associated with the connection of the proposed Seskin Wind Farm to the national electricity grid, via underground 38kV electrical cabling within the public road corridor to the existing Kilkenny 110kV substation; (ii) Provision of 16 no. joint bays, communication chambers and earth sheath links along the underground electrical cabling route; (iii) Reinstatement of the road and track surfaces above cabling trench along existing roads and tracks; (iv) Carriageway strengthening works at ‘Black Bridge’ on the L1835 / L3037 (Protected Structure RPS Ref. D84); (v) A new temporary access road off the N78 to the L30372 in the townlands of Cloneen, Co. Kilkenny to facilitate the delivery of turbine components and other abnormal loads; (vi) All ancillary apparatus and site development works above and below ground. / 4.5 km away / 10 March 2025Refused