Coole, Ballyragget, Co Kilkenny
Planning application 2560640
DecisionConditional grant
Decided26 November 2025
Application typeRETENTION
Source documents1
Site
What is on file
0refusal reasons0conditions8nearby records
Proposed development
Application description published by Kilkenny County Council.Decision details
Core application dates and identifiers from the public planning record.Planning analysis
Refusal reasons and planning conditions extracted from the public decision file.Refusal reasons
No refusal reason on record
Documents are indexed. Reason extraction for Kilkenny has not started yet.
Conditions
No conditions
No conditions are on record for this application yet.
Planning a project near Coole, Ballyragget, Co Kilkenny?
Get a site risk brief with the local decision pattern and up to 80 detailed nearby comparables (40 refusals and 40 grants), including extracted reasons and source links. €49 incl. VAT, PDF by email.Source documents
Original council portal records and source PDFs where available.- Application fileApplication file on www.eplanning.ieSource portal
Nearby precedent
Similar nearby applications linked to this planning decision.- 18792For construction of farm building for straw and general storage / 0.5 km away / 27 May 2019Granted
- 2037For the construction of a four bedroom bungalow, garden shed, percolation area and all associated site works / 0.6 km away / 11 May 2020Granted
- 18729For the retention of extension to dwelling and all associated site works at / 0.7 km away / 22 February 2019Granted
- 1880For construction of slatted cattle shed with underground tank and all associated site works as constructed at / 0.8 km away / 28 March 2018Granted
- 2460241For a Battery Energy Storage System (BESS) in the townland of Moatpark, Ballyragget, Co. Kilkenny. The development will consist of; • A 10-year Planning Permission and an operational life of 35 years • 29 units of 8 containers on concrete plinth foundations containing batteries and related equipment • 29 no. prefabricated modular power conversion units • Containerised power transformers • Underground electrical and communications cabling • Upgrade of existing site access • Provision of on-site access tracks • 1 no. temporary construction compound • 4 no. spare parts containers • All associated and ancillary site development, lighting, perimeter fence, landscaping, drainage and CCTV. The planning application will be accompanied by a Natura Impact Statement (NIS). / 0.9 km away / 10 December 2024Granted
- 19701To construct a two storey dwelling house and detached garage, waste water treatment system, bored well and all associated site works at / 0.9 km away / 20 November 2019Granted
- 2460534For a 2000sq.m extension to the existing Ballyragget 110kV Substation compound including; Site clearance works including the removal of existing palisade fence along the North and West boundaries and demolition of an existing Interface Transformer bund foundation. Provision of new electrical plant and equipment including: 1 No. Power Transformer, associated bund and firewall (c. 67 m2, 5.6 m high), 1 No. 20 / 10 kV Interface Transformer and associated bund (c. 25 m2, and 2.25 m high), 1 No. Arc Suppression Coil and associated bund (c. 18 m2, and 4.0 m high), a 38 kV busbar plinth with 3 No. cubicles and associated cable sealing ends (c. 6.5 m high), associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; Site development works including provision of extension of lighting, internal access road, new fencing, provision of site services including drainage; and all other ancillary works / 0.9 km away / 10 January 2025Granted
- 22687For development. The proposed development will consist of: Construction of two anaerobic digesters, one equalization tank to include concrete base, earth embankment and associated works; construction of biogas storage dome with biogas flare, desulfurization unit; construction of membrane and control building with yard slab and link road; construction of ferric chloride storage tank; installation of a new pipeline with underground and overground sections for the purpose of conveying renewable biogas to the Glanbia facility east of the N77 road; realignment of the existing internal road to facilitate vehicle movements; drainage works and all associated site works including landscaping. The dismantling and removal of an existing disused sludge mixing tank; dismantling and removal of an existing biotower. This facility holds an industrial emissions licence issued by the Environmental Protection Agency. A Natura Impact Statement (NIS) will accompany this application / 0.9 km away / 27 February 2023Granted